My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2008-058 2006-2008
ClerkCouncil
>
Council Records
>
Ordinances
>
2008
>
ORD 2008-058 2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2008 2:22:17 PM
Creation date
6/18/2008 2:07:43 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2006-2008
Year
2008
Ordinance
058
Effective Date
5/8/2008
Document Relationships
BIL 235 Draft 04 2006-2008
(Related)
Path:
\Council Records\Bills\2006-2008
COM 0997.025 2006-2008
(Related)
Path:
\Council Records\Communications\2006-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Friday between the hours of 3:30 p.m. and 6:30 p.m. (except <br />holida s <br />d. Neither the applicant Oceanside 1250 (Hokuli`a) nor any of its <br />contractors or subcontractors shall use Haleki`i Street for and <br />construction vehicles and shall instead use Kind Kamehameha III <br />Road as the ingress and egress for all construction vehicles to the <br />Hokuli`a proiect or shall build a temporary connector road from <br />Mamalahoa Highway to the Mamalahoa Highway Bypass for <br />construction vehicles; <br />e. Within three nears from the effective date of this amendment, the <br />County of Hawaii shall: <br />Install permanent, three-way si¢nal lights at the <br />intersections of Royal Poinciana Drive - Ali`i Drive, <br />Lunapule Road - Ali`i Drive, and Hualalai Road - Ali`i <br />Drive; <br />Construct a pedestrian path mauka of Ali`i Drive between <br />King Kamehameha III Road and the northwestern end of <br />the Mamalahoa Highway Bypass; and <br />Resolve bike pedestrian, and right-of--way encroachments <br />on Ali`i Drive between Kailua-Kona and Keauhou. <br />£ Test period Upon the opening of Haleki`i Street for use by the <br />general public as a public vehicular thoroughfare between the <br />Mamalahoa Highway Bypass and the Mamalahoa Highway, a 180- <br />dav test period shall commence. After the first sixty (60) days <br />have elapsed within the 180-day test period, the Director of Public <br />Works shall submit a report to the County Council evaluatine the <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.