Laserfiche WebLink
A. prior to the full opening of the Mamalahoa Hiehwa <br />Bypass to Napo`opo`o; or <br />B. if the usage of Haleki`i Street Extension to the <br />Mamalahoa Highway by the general public is <br />permitted for more than the three-hour period <br />authorized by Condition L.4.c.; <br />Convert the Royal Poinciana Drive -Ali`i Drive intersection <br />and the Lunanule Road - Ali`i Drive intersection to a three- <br />way stop as soon as practicable; <br />Construct eight-foot bike and walking path on the makai <br />shoulder of Ali`i Drive between King Kamehameha III <br />Road and Kaleiopapa Street; and <br />Install speed limit SMART signs on Ali`i Drive between <br />Lunapule Road and Kin¢ Kamehameha III Road to assist in <br />speed enforcement. <br />c. Commencement: Opening of Haleki`i Street as a public vehicular <br />thoroughfare between the Mamalahoa Highway and the existing, <br />northern section of the Mamalahoa Highway Bypass shall not be <br />allowed until all mitigation measures outlined in Conditions L.4.a. <br />(1 - 10) and L.4.b. (1-6) above have been completed and <br />implemented Upon opening Haleki`i Street for use by the eg neral <br />public drivin¢ eastbound from the Mamalahoa Highway Bypass, <br />such general public traffic will only be allowed in a southbound <br />direction on the Mamalahoa Highway Bypass to the Haleki`i Street <br />Extension. and then eastbound on the Haleki`i Street Extension <br />onto the Mamalahoa Hishwav, Monday through Friday between <br />the hours of 3:30 p.m. and 630 p.m. (except holidays); <br />d. Neither the applicant, Oceanside 1250 (Hokuli`a) nor any of its <br />contractors or subcontractors shall use Haleki`i Street for any of its <br />construction vehicles and shall instead use King Kamehameha III <br />Road as the ingress and egress for all construction vehicles to the <br />Hokuli`a proiect or shall build a temporary connector road from <br />Mamalahoa Highway to the Mamalahoa Highway Bypass for <br />-5- <br />