Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Pete Hoffmann, Chairman <br /> and Members of the County Council <br /> Page 5 <br /> <br /> The concurrency ordinance also provides that the Planning Director shall give <br /> options to the council on how concurrency can be achieved. In this situation, there are <br /> several possible alternatives: <br /> <br /> Alternative 1: The draft Kona Community Development Plan proposes a <br /> connector road in the vicinity of this property, that would provide a mauka-makai <br /> connection between Alii Drive and the Kahalui-Keauhou Parkway. The alignment of the <br /> connector is conceptual in the draft CDP, and is shown on the boundary between this <br /> property and the KIC property to the south. See Exhibit 18. The eventual connection to <br /> the Parkway would be on KIC property. The Parkway plans originally had an intersection <br /> at Makolea St., about .6 miles to the south, but this had to be eliminated because of the <br /> burial issue near this intersection. The result is that unless there is another connection as <br /> shown in the CDP, there would be no connection between Alii Drive and the Kahului - <br /> Keauhou Parkway between the Keauhou Shopping Center and La' aloa Ave., a distance of <br /> about 1.8 miles. The conditions of zoning would allow this to be built as a minor or local <br /> street, rather than as a collector, because it would be just one of a network of streets <br /> eventually providing access between Alii Drive and the Kahului - Keauhou Parkway. The <br /> difficulty for the applicant with Alternative 1 is that it cannot connect to Alii Drive <br /> without access through property it does not currently own. <br /> <br /> Alternative 2: the applicant could provide improvements to Alii Drive, <br /> specifically, a left turn lane at the Queen Kalama/Alii Drive intersection. <br /> <br /> Alternative 3: the applicant could provide twice the affordable housing normally <br /> required under Chap. 11. In this case, the applicant would still be required to make some <br /> improvements to the Queen Kalama/Alii Drive intersection because of safety and traffic <br /> flow issues. <br /> <br /> Alternative 4: the applicant could wait for occupancy until funds have been <br /> committed for Phase I of the Kahului - Keauhou Parkway. Although Kuakini might still <br /> be at LOS "E", the TIAR projects traffic on the Kahului - Keauhou Parkway to be at LOS <br /> "D" in 2016, hence adequate under the concurrency standards. In this case, the applicant <br /> would still be required to make some improvements to the Queen Kalama/Alii Drive <br /> intersection because of safety and traffic flow issues. <br /> <br /> The proposed conditions of zoning are written so that the applicant has the option <br /> of Alternative 1 or 2. If Alternative 1 is chosen, the applicant would not be expected to <br /> make any improvements to the Queen Kalama/Alii Drive intersection, because most of <br /> the project traffic would be expected to use the new alternative road. If Alternative 2 is <br />