Laserfiche WebLink
(I) Plan approval may be required as a condition of approval of any use permit, vaziance, <br />or other action relating to a specific use, in which case the use or development so <br />conditioned may not be established until plan approval has been secured. <br />~ Plan approval shall be required for the establishment of an~gricultural tourism <br />activity, as permitted under section 25-4-15(b)." <br />SECTION 4. Chapter 25, article 2, division 7, Hawaii County Code 1983 (2005 Edition; <br />as amended), is amended by adding a new section to be designated section 25-2-75 and to read as <br />follows: <br />"Section 25-2-75. Plan aaaroval application requirements for agricultural tourism. <br />In addition to the application requirements for plan approval contained in section 25-2-72, <br />an application fo~lan approval for agricultural tourism operations shall include sufficient <br />information to ensure the followingprovisions are met: <br />(1) A statement whether the operation will allow visits by buses; <br />(2) Adequate off street parking, loading/unloading, and turn-around space to <br />accommodate all specified tour transportation modes, including buses, if they are <br />allowed, shall be provided and shown on the site plan; <br />(3) The subiect uroperty must have an existing legal access to a public highway, which <br />may be via a private road or easement, and new driveways shall meet applicable <br />county or state standards; <br />(4) New and existing facilities to be utilizedprincipally for the agricultural tourism <br />activity shall be clearly indicated on the plot plan and shall not exceed one thousand <br />ware feet in total azea, not including_parking and vehicular accesses; and <br />(5) Proof, acceptable to the director, of income from agricultural activities and/or <br />4 <br />