My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0062.009 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0062.009 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2009 11:47:17 AM
Creation date
1/12/2009 2:16:48 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0062
Point
009
Author
Donald Ikeda, Councilmember
Communications - Referred To
COUNCIL
Comments
Council: Close file - 01/23/09
Document Relationships
AGE COUNCIL 01/23/2009 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> January 12, 2009 <br /> Page 2 <br /> <br /> <br /> E. Final subdivision approval for the first subdivision phase shall be secured within <br /> five (5) years from the effective date of this ordinance. <br /> H. The applicant shall provide road and traffic improvements as follows: <br /> <br /> Alternative 1: Construct a new alternate access road from [AliLi] Ali`i Drive to <br /> the project through currently vacant property to the west or south, meeting with <br /> the approval of the Department of Public Works. The road may be constructed as <br /> a minor or local street and may allow direct access from individual lots, and shall <br /> be dedicated to the County upon completion. It shall include a dedicated left turn <br /> lane at the [A44] Ali`i Drive intersection. The road shall connect with a street in <br /> the project that provides a further stubout to the adjacent property to the south <br /> (TMK: 7-8-010:004). All construction required in Alternative 1 herein shall be <br /> completed or bonded before final subdivision approval for the first phase of the <br /> proposed project, or, Alternative 2: t i ent° °t the inters--t'-- <br /> f• lii n d o v 1 Stree` or r wall" n.,enue inel ding a left tur <br /> t f' n l• n n v t Str et or ba'alo n. - nd <br /> `c <br /> ] Provide concrete curbs, <br /> gutters sidewalks and appropriate drywells for drainage control from the <br /> proposed development along one side of Naniloa Street to Queen Kalama Street <br /> and then from Naniloa Street along the south side of Queen Kalama Street to Ali`i <br /> Drive These improvements the total costs of which shall be limited to <br /> applicant's fair share contribution for road and traffic improvements under <br /> Condition U herein, shall include any necessary pavement widening retaining <br /> structures signs traffic markings and streetlights drainage improvements, and <br /> relocation of utilities meeting with the approval of the Department of Public <br /> Works All construction required in Alternative 2 herein shall be completed or <br /> bonded before final subdivision approval for the first phase of the proposed <br /> rP oject. <br /> <br /> I. <br /> <br /> th - -T- .t 'f n 1 h . hall .ide st..l.'vvout_to he <br /> > <br /> <br /> <br /> <br /> N it S n 1'• D .t h dj pe'.ty ie the south /TARV. 7 Q <br /> > <br /> <br /> <br /> 7 > <br /> eempletiet3. J <br />
The URL can be used to link to this page
Your browser does not support the video tag.