Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />maintenance of the Facility. The Contractor shall at all times have staffing and equipment <br /> <br />necessary to support County operations of the Facility at waste loading up to 400 tons per day. <br /> <br />Upon reasonable notice by County, the Contractor shall provide staffing and equipment adequate <br /> <br />to support County operations of the Facility at increased waste loading rates. When Contractor's <br /> <br />employees and equipment are utilized, the County will pay to Contractor hourly pay rates <br /> <br />equivalent to rates incorporated in the County's latest price term agreement for similar <br /> <br />equipment. Similar may not necessarily mean equivalent. County shall furnish Contractor its <br /> <br />existing price term agreement. <br /> <br />In the event of incidents or emergencies at the working face, the Contractor will <br /> <br />direct the remedial activities as described in Section 8.0, Emergency Operating Procedures of the <br /> <br />Operations Manual, to resolve the situation. Ifnecessary, the Contractor will augment the <br /> <br />County's work force with its own work force, including its own equipment, to ensure a <br /> <br />satisfactory resolution to the incident or emergency. The Contractor will be paid for the use of <br /> <br />its work force and equipment at a mutually agreeable price. The Contractor shall be required to <br /> <br />submit detailed cost pricing data to justify all charges. <br /> <br />(c) The Contractor shall employ the services of an independent Hawaii <br /> <br />certified laboratory to sample and analyze groundwater from the monitoring wells. Numbers and <br /> <br />locations of the wells shall be in accordance with construction drawings documenting the <br /> <br />construction permit application and as shown in the operating plan and the groundwater <br /> <br />monitoring plan as approved by the Department. Number and frequency of samples, sampling <br /> <br />and analytical procedures, parameters analyzed and test reporting requirements s,hall comply <br /> <br />fully with applicable provision of the approved operating and groundwater monitoring plans. <br />-3- <br /> <br />" <br /> <br />. <br /> <br />. <br />