Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> C. The applicant shall submit the required water commitment payment to the <br /> <br /> Department of Water Supply in accordance with its "Water Commitment <br /> <br /> Guidelines Policy" within ninety (90) days from the effective date of this change <br /> of zone. <br /> <br /> <br /> D. Final Subdivision Approval of the proposed agricultural subdivision shall be <br /> <br /> secured from the Planning Director within five (5) years from the effective date of <br /> this ordinance. The applicant shall reserve the following easements and special <br /> <br /> setbacks in perpetuity for purposes of protecting and maintaining naturally <br /> forested areas and shall delineate such easements and setbacks on plans submitted <br /> <br /> for subdivision review: <br /> <br /> <br /> 1. a 100-foot wide "forest reserve easement" along the existing roadway <br /> frontage of the subject property, exclusive of the access point permitted by <br /> <br /> the Department of Public Works; <br /> <br /> <br /> 2. a 30-foot "forest reserve easement" along all lot lines not covered by the <br /> <br /> 100-foot easement; and <br /> <br /> <br /> 3. a 100-foot wide structural setback in lieu of the required 30-foot setback <br /> along the existing property's public street frontage to provide an additional <br /> <br /> buffer. <br /> <br /> <br /> E. Restrictive covenant(s) in the deeds of all the proposed agricultural lots fronting <br /> existing roads shall specify and uphold the easements and setbacks set forth in <br /> <br /> Condition D. The restrictive covenant(s) shall also specify that, including the area <br /> comprising the forest reserve easements described in Condition D, no less than <br /> <br /> eighty percent (80%) of the entire lot area shall be retained in forest. A copy of <br /> <br /> <br /> -3- <br />