Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />-- <br />. '. <br /> <br />that the use of Parcel 2 shall be limited to the construction and operation of a <br />ready-mix concrete batching plant and its subordinate accessory uses. In the <br />event that either (1) the ready-mix concrete batching plant is not constructed and <br />in operation within [two] m years of the effective date of this bill or (2) the <br />ready-mix concrete batching plant terminates its operations or fail to comply <br />with any provisions as required by the State Land Use Commission I s Decision <br />and Order and the Conditions of Approval, the Planning Director shall initiate <br />rezoning of its original or more appropriate designation. <br /> <br />Q. An annual progress report shall be submitted to the Planning Director prior to <br />the anniversary date of the effective date of this Change of Zone. The report <br />shall address the status of the development and the compliance with the <br />conditions of approval. This condition shall remain in effect until all of the <br />conditions of approval have been complied with and the Planning Director <br />acknowledges that further reports are not required. <br /> <br />R. An extension of time for the performance of conditions within the ordinance <br />may be granted by the Planning Director upon the following circumstances: <br />1. The non-performance is the result of conditions that could not have been <br />foreseen or are beyond the control of the applicant, successors or <br />assigns, and that are not the result of their fault or negligence. <br />2. Granting of the time extension would not be contrary to the general plan <br />or zoning code. <br />3. Granting of the time extension would not be contrary to the original <br />reasons for the granting of the Change of Zone. <br />4. The time extension granted shall be for a period not to exceed the period <br />originally granted for performance (i.e., a condition to be performed <br /> <br />-5- <br />