Laserfiche WebLink
the subject property prior to the issuance of a Certificate of Occupancy. All <br />sight distances to the approach shall meet the requirements of the Hawai°i <br />Statewide Uniform Design Manual (AASHTO). <br />G. Any utility poles in the road right-of-way shall be installed as shown on DPW <br />Standard Detail R-35 (Revised). The applicant shall provide any necessary <br />easements for installation of such utilities. <br />H. Any vehicular security gate shall be located a minimum of 60 feet (exclusive of <br />gate swing) from the proposed [I~ualalai] Hualalai Road right-of-way with a <br />turnaround on the County road side of the gate. This 60-foot requirement shall <br />not apply to the emergency access. <br />L All development generated runoff shall be disposed of on-site and shall not be <br />directed toward any adjacent properties. <br />A drainage study shall be prepared by a licensed civil engineer and submitted to <br />the Department of Public Works. The recommended drainage system shall be <br />constructed, meeting with the approval of the Department of Public Works, <br />prior to the issuance of a Certificate of Occupancy. <br />K. A Solid Waste Management Plan shall be submitted to the Department of <br />Environmental Management prior to the issuance of a Certificate of Occupancy. <br />L. > <br />. The Department of <br />Environmental Management requires the submittal of a sewer study by the <br />applicant to the County of Hawaii Wastewater Division (COH-WWD). The <br />sewer study is intended to define the wastewater flow contribution from the <br />-3- <br />