Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Condition I: Grading and drainage has already been accepted for Phase I and permitted <br /> for Phase II and III. <br /> <br /> Condition J: After discussing with Paul Okuda at Freshwater COH, our project does not <br /> require an Underground Injection Control (UIC) permit. <br /> <br /> If we can be of further assistance, please contact us at 987-9719 as soon as possible. <br /> <br /> <br /> Sincerely yours, <br /> <br /> <br /> <br /> William and Dixie Minson, owners <br /> Aloha Plaza <br />