My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 1999-042 1998-2000
ClerkCouncil
>
Council Records
>
Ordinances
>
1999
>
ORD 1999-042 1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2008 6:59:28 PM
Creation date
5/10/2008 5:27:38 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
1998-2000
Year
1999
Ordinance
042
Comments
Referred: PC - 10/27/98 PC: Defer - 11/05/98 ‎(PC 047)‎PC-166: Recs. Bill 332, Dr. 2, as amended to Dr. 3, pass 1st rdg.- 11/17/98 ‎(PC 008)‎
Document Relationships
BIL 332 Draft 03 1996-1998
(Related To)
Path:
\Council Records\Bills\1996-1998
COM 1051.000 1996-1998
(Related)
Path:
\Council Records\Communications\1996-1998
COM 1051.025 1996-1998
(Related To)
Path:
\Council Records\Communications\1996-1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I. Final Subdivision or Final Plan Approval, whichever is applicable, shall be <br /> secured from the Planning Director for any of the above uses prior to the <br /> issuance of any land alteration permits for any development phase in the <br /> Kaupulehu Project District. <br /> J. Construction of the residential units, commercial development, golf course and <br /> other related improvements shall commence only after Final Subdivision <br /> Approval and Final Plan Approval has been secured. <br /> K. The applicant shall provide assurance satisfactory to the Department of Water <br /> Supply and the Planning Director, upon consultation with the State Department <br /> of Health and Department of Land and Natural Resources, that water sources of <br /> sufficient quality and quantity has been established. Such satisfactory assurance <br /> can be met by the actual drilling and testing of a well site of the water source or <br /> by the submittal of a hydrological study certifying that a water sources of <br /> sufficient quality and quantity can be established at the designated locations. <br /> L. Upon compliance with Condition K, the actual development of the water source <br /> and its water transmission and distribution system shall be developed in <br /> conjunction with the subdivision approval process. Final inspection to the <br /> residential structures shall not be issued until the approved water source is <br /> developed and its transmission and distribution system for such source to the <br /> subject property has been constructed. Residential building permits may be <br /> issued for model home complexes, provided that such model homes will not be <br /> occupied until the approved water source is developed. <br /> M. The interior roadway requirements for the Kaupulehu Project District shall be <br /> designed to resort standards as allowed by the Subdivision Code and as <br /> represented in Section 3.3.1 of the applicant's Project District Application. <br /> -16- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.