Laserfiche WebLink
(1) Complete construction of the roadway section from Keauhou to the <br /> makai extension of Haleki'i Street; and <br /> (2) Install a barricade or breakaway gate meeting with the requirements <br /> of the COUNTY Department of Public Works if, before the completion and opening of the entire <br /> Bypass Highway, a portion of said bypass is completed and opened, and said portion provides a <br /> connection to Haleki'i Street; <br /> d. In any event from the time construction commences, the entire Bypass <br /> Highway shall be completed within five (5) years provided that those certain circumstances as <br /> articulated in Paragraph (39) do not exist. <br /> 14. DEDICATION OF BYPASS HIGHWAY. The Bypass Highway shall be dedicated to <br /> the COUNTY in phases, if any, upon completion and the COUNTY shall accept said dedication <br /> within sixty(60)calendar days; provided that the Bypass Highway, as constructed, complies with <br /> plans and specifications for said highway as approved by the County. Following dedication of the <br /> Bypass Highway to the COUNTY, the COUNTY shall assume all responsibility and costs for <br /> operation, maintenance, repair or reconstruction of the Bypass Highway. <br /> 15. REIMBURSEMENT OF CONSTRUCTION COSTS FOR THE BYPASS HIGHWAY. <br /> a. Responsibility of Developer. OCEANSIDE shall be responsible for all <br /> costs associated with the design, land acquisition, construction of the Bypass Highway, including, <br /> without limitation, the costs associated with obtaining any necessary Approvals associated with <br /> the same ("Total Cost"); provided that, nothing herein shall be construed as preventing <br /> OCEANSIDE from seeking reimbursement for such costs and the total amount of reimbursement <br /> received by OCEANSIDE shall not exceed the difference between the Total Cost of the Bypass <br /> Highway and the .Project Impact Cost., as described in further detail in Paragraph(15.a.1). <br /> 21 <br />