Laserfiche WebLink
1 EXECUTIVE SUMMARY <br /> 1 • Establish a County recycling program with a long list of elements that have the potential <br /> to increase waste diversion significantly <br /> 1 After adopting the 2002 ISWMP update, the County took steps toward implementing these <br /> recommendations, as follows: <br /> 1 • Expanding the number and scope of its recycling programs, which increased its <br /> recycling rate from 15 percent in FY 01 -02 to 29 percent in FY 07 -08 <br /> 1 • Initiating development of elements of the East Hawai'i Regional Sort Station (now <br /> nearing completion) that could potentially serve a number of strategic waste <br /> management functions <br /> 1 • Issuing two (2) requests for proposals (RFPs) for construction of a waste reduction <br /> facility. The first RFP was cancelled by the County. The second procurement process <br /> resulted in a proposal for a 230 - ton - per -day mass -burn waste -to- energy facility to be <br /> I located at the SHSL. In 2008, the County Council rejected the recommended proposal, in <br /> part because the construction and operation costs were higher than anticipated. <br /> I Since 2006, the County has taken three (3) other important actions related to its solid waste <br /> management system: <br /> Keadldw Maul) NTS <br /> I 1. It completed a 4,,46(6., %) <br /> comprehensive engineering <br /> evaluation of its Nene Isn'a RT. <br /> 1 (21) recycling and transfer ''6°(` <br /> stations; this evaluation <br /> concluded that thirteen (13) RTa - '" *"eels 1 In <br /> 2,88113 3 %) 919iemr♦ RT5 1.922 (2.4 %) 1,547 (1 9%) . <br /> ' have serious failures 6378(78%) <br /> requiring reconstruction to • N«Iame RTa <br /> J qbt 11811911 <br /> 1,727 (2.1 %) <br /> correct, and another six (6) � �.M•.1,.�.1. <br /> 41,916 @,.9'!L) .,...es„ IIT, 1118•111 1"w.. <br /> 1 have serious problems that 2962( „%) 4.471.-(411144) could be corrected without 7,860 Kellum , •. <br /> Nat RT9 <br /> complete reconstruction. 14.707(18.1 %) R Rya <br /> 7,443 (9.1 %) <br /> 1 2. It extended the capacity of <br /> Klrrrr Rra 2. 6% RTa <br /> in <br /> the SHSL through irovative 6.6,7 (6.2%) 1 2 � (3 (3.6%) <br /> engineering solutions, such K ,. « , 1 „ %Ta ”, T:e <br /> 1 2 .026 (2.6 %) 1,929 (2.4 %) Palm, RTS <br /> as creating a sliver fill and 5 . 75 9( 7 . 1 %) <br /> utilizing additional airspace 1Ni1ii 11 <br /> 2,96913.6% Relapses R111 resulting from creation of the 1.66911.3 %) <br /> 1 sliver fill. <br /> Mbar RTS raA.1. RTa <br /> 207 (0.3 %) 1.304(18%) • <br /> 3. It prepared an expansion <br /> 1 feasibility study and capital <br /> cost estimate to assess <br /> whether undertaking a 344w•�1•11TS <br /> Ocean %Sew 1 seven (7) acre landfill 0.,,,,...) expansion immediately <br /> adjacent to the SHSL would <br /> Disposal Ha1Tai'I County <br /> Note. Numbers FY 07 08 en M p d station n = f tot d 1 <br /> N hauled Co u Recycling and Trunks' Stations <br /> in FY 07.06 percent n of for Conty. FY 0708 <br /> fI*u 19■MOSID 40 Nom / nest a., WM -- - -- <br /> 1 December 2009 ES-3 <br />