My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2010-064 2008-2010
ClerkCouncil
>
Council Records
>
Ordinances
>
2010
>
ORD 2010-064 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2010 9:44:38 AM
Creation date
6/23/2010 9:16:54 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2008-2010
Year
2010
Ordinance
064
Effective Date
6/18/2010
Document Relationships
BIL 242 Draft 01 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
BIL 242 Draft 01 2008-2010
(Related To)
Path:
\Council Records\Bills\2008-2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prevent non - emergency vehicular access. Should the immediately affected existing <br /> neighborhood(s) desire to have the barriers permanently removed to allow for unrestricted <br /> vehicular access between the site and any existing side street to the north, the Planning <br /> Director, upon consultation with the Department of Public Works and immediately <br /> affected neighbors, may lift this restriction. <br /> T. Streetlights and traffic control devices, as may be required by the Traffic Division, <br /> Department of Public Works, shall be designed, purchased and installed by the applicant. <br /> U. Updated Traffic Impact Analysis Report(s) (TIAR) certified by a licensed engineer shall <br /> be submitted to the Planning Director for review and approval prior to receipt of Final <br /> Plan Approval for each phase of the development or Preliminary Subdivision Approval <br /> for each phase of the residential development and not bulk lot subdivision. All additional <br /> mitigation measures, including intersection and /or roadway improvements, called for in <br /> the updated TIAR shall be implemented prior to receipt of a Certificate of Occupancy or <br /> Final Subdivision Approval, as the case may be. In the case of the Final Subdivision <br /> Approval, completion of construction may be assured by a sufficient surety bond meeting <br /> with the approval of the County. <br /> V. Because of potential roadway noise, there shall be a minimum 70 -foot setback from the <br /> Komohana Street right -of -way, and a 90 -foot setback from the Mohouli Street right -of- <br /> way, for any residential structure. <br /> W. All development - generated runoff shall be disposed of on -site and shall not be directed <br /> toward any adjacent properties. A drainage study shall be prepared by a licensed civil <br /> engineer and submitted to the Department of Public Works for review and approval prior <br /> to issuance of Final Plan Approval or Final Subdivision Approval, whichever occurs first. <br /> Any recommended drainage improvements, if required, shall be constructed meeting <br /> with the approval of the Department of Public Works prior to receipt of a Certificate of <br /> -11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.