My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0876.002 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0876.002 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2010 2:58:26 PM
Creation date
7/23/2010 9:31:10 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0876
Point
002
Author
Emily I. Naeole-Beason, Council Vice Chair
Communications - Referred To
PWIRC
Comments
Council: Close file - 09/09/10
Document Relationships
AGE COUNCIL 09/09/2010 2008-2010
(Related To)
Path:
\Council Records\Agendas\2008-2010\Council
AGE PWIRC 08/03/2010 2008-2010
(Related)
Path:
\Council Records\Agendas\2008-2010\Public Works & Intergovernmental Relations Committee (PWIRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspection is called is not complete or when corrections called for are not <br />made. <br />This section is not to be interpreted as requiring reinspection einspection fees the first <br />time a job is rejected for failure to comply with the requirements of this <br />code but as controlling the practice of calling for inspections before the <br />job is ready for such inspection or reinspection. <br />Re- inspection fees may be assessed when the building_ permit card is not <br />posted or otherwise available on the work site the approved plans are not <br />readily available to the inspector, for failure to provide access on the date <br />for which inspection is requested or for deviating from rom plans requiring the <br />approval of the code official. <br />To obtain reinspection the applicant shall file an application thereof in <br />writing on a form furnished by the code official and pay the reinspection <br />fee of $50 for each additional inspection. <br />In instances where reinspection fees have been assessed, no additional <br />inspection of the work will be performed until the required fees have been <br />Raid " <br />(9) Amending Section 104.8. Section 104.8 is amended to read as follows: <br />"104.8 Approval. After [ t'' e pr-eser-ibed tests and inspeetie==s- required <br />inspections indicate that the work complies in all respects with this code, a <br />notice of [approval] inspection or certificate of occupancy shall be issued <br />by the code official." <br />(10) Amending Section 202. Section 202 is amended by adding the following <br />definitions to read as follows: <br />" CERTIFICATION As used herein the word certify shall mean an <br />expression of the licensed professional's opinion to the best of its <br />information knowledge, and belief, and does not constitute a warranty or <br />guarantee. <br />FULLY SHADED WINDOWS windows protected from direct solar <br />heat gain by a projection factor of no less than 1.0 projection shall be <br />oriented such that the full window is shaded year round. <br />
The URL can be used to link to this page
Your browser does not support the video tag.