My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 304 Draft 01 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 304 Draft 01 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2011 3:11:20 PM
Creation date
9/23/2010 3:26:55 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
304
Draft
01
Introducer
Pete Hoffmann, Council Member
Referred To
PC
Action 1
PC: Postponed to next meeting of 11/16/2010 - 10/19/2010
Action 2
PC: Postponed to next meeting of 02/01/2011 - 01/04/2011
Action 3
PC: Postponed to April 5, 2011 - 03/02/2011
Document Relationships
AGE PC 01/04/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Planning Committee (PC)
AGE PC 02/01/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Planning Committee (PC)
AGE PC 03/02/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Planning Committee (PC)
AGE PC 10/19/2010 2008-2010
(Related)
Path:
\Council Records\Agendas\2008-2010\Planning Committee (PC)
COM 0954.000 2008-2010
(Related)
Path:
\Council Records\Communications\2008-2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School / 1,000 sq. ft. $567 $0 $234 $279 $0 * $1,080 <br /> College <br /> Hospital 1,000 sq. ft. $4,938 $0 $234 $279 $0 * $5,451 <br /> Nursing Home 1,000 sq. ft. $1,390 $0 $234 $279 $0 * $1,903 <br /> Other 1 ' 000 sq. ft. $3,094 $0 $234 $279 $0 * $3,607 <br /> Institutional <br /> * See wastewater impact fees by water meter size below for non - residential development. <br /> ** Does not include wastewater impact. <br /> Water Meter Size Wastewater Impact Fee <br /> 5/8" x 3/4" Meter $1,892 <br /> 1" Meter $4,731 <br /> 1 -1/2" Meter $9,463 <br /> 2" Meter $15,140 <br /> 3" Meter $30,281 <br /> 4" Meter $47,315 <br /> 6" Meter $94,629 <br /> 8" Meter $151,407 <br /> 10" Meter $274,425 <br /> (b) The fees set out in subsection (a) shall be adjusted annually to account for inflation. At <br /> the end of each calendar year, the impact fee administrator shall prepare an adjusted fee <br /> schedule, which will be posted on the County's website and be made publicly available. <br /> The adjusted fee schedule will go into effect on January 1 of the following year. <br /> (c) The adjustment factor shall be the ratio of the appropriate cost index for the quarter <br /> during which the adjustment is made (even if projected) to the same cost index for the <br /> quarter during which the fees were last adopted, updated or adjusted. The appropriate <br /> cost indices shall be as follows from the most recent edition of the U.S. Army Corps of <br /> Engineers, Civil Works Construction Cost Index System, utilizing the Hawai`i <br /> adjustment factors: <br /> (1) For road impact fees, the roads, railroads and bridges index; <br /> (2) For park impact fees, the recreation facilities index; and <br /> (3) For fire /EMS, police, solid waste, and wastewater impact fees, the buildings, <br /> grounds and utilities index. <br /> In the event that the referenced cost indices are not available, the updates shall be based <br /> on reasonable alternative indices as determined by the impact fee administrator. <br /> (d) Impact fees due and payable shall be net of any approved offsets available pursuant to <br /> section 36 -17, post- ordinance credits, and section 36 -18, pre- ordinance offsets. It shall <br /> be the responsibility of the applicant to claim offsets prior to payment of impact fees. <br /> Any offsets not claimed shall be deemed waived. <br /> (e) If the type of impact - generating development is not specified on the above schedule, the <br /> impact fee administrator shall determine the fee on the basis of the fee applicable to the <br /> most nearly comparable type of land use on the fee schedule. In the case of road impact <br /> fees, the impact fee administrator shall be guided in the selection of a comparable type of <br /> -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.