My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0999.000 2008-2010
ClerkCouncil
>
Council Records
>
Communications
>
2008-2010
>
COM 0999.000 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 1:28:42 PM
Creation date
11/3/2010 12:33:10 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2008-2010
Communication
0999
Point
000
Author
Nancy E. Crawford, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 01/20/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 02/02/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE FC 01/03/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Finance Committee (FC)
BIL 322 Draft 01 2008-2010
(Related To)
Path:
\Council Records\Bills\2008-2010
BIL 322 Draft 01 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
REP FC 003 01/03/2011 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B -52 <br /> 7/18/91 <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Public Works DATE: 10/28/10 <br /> STAFF CONTACT: Allan Simeon PHONE: 961 -8925 <br /> A. REQUEST: <br /> to -loo <br /> An ordinance amending Ordinance t9-8t increasing the CIP appropriation 110.399.5395.79; <br /> from $600,000 to $8,700,000 for planning and preliminary engineering design; engineering <br /> design, Right of Way acquisition and construction for the Kapiolani Street Extension, Mohouli <br /> Street to Lanikaula Street project. <br /> Kapiolani Street Extension (Mohouli Street to Lanikaula Street) [$600,000] increased to a total <br /> of $8,700,000. <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> The basis for the increase in the appropriation is to include funding for engineering <br /> design, Right of Way acquisition and construction costs. <br /> The prior funding request of $600,000 was for planning and preliminary engineering <br /> design and did not include the entire engineering design, Right of Way acquisition and <br /> construction costs. Also, requesting to move additional funding to current fiscal year <br /> to enable procurement of the design engineering consultant and acquisition of Right of <br /> Way upon completion of the planning and preliminary engineering phase or as soon <br /> as possible thereafter. <br /> SIGNED: DATE: /eA2 cleb � <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.