Laserfiche WebLink
3. <br />250' <br />19' <br />30" <br />0.59 <br />feet to a point; <br />4. <br />240' <br />38' <br />00" <br />37.79 <br />feet to a point; <br />5. <br />251' <br />02' <br />30" <br />15.62 <br />feet to a point; <br />6. <br />266' <br />44' <br />00" <br />29.34 <br />feet to a point; <br />7. <br />250° <br />05' <br />00" <br />29.19 <br />feet to a point; <br />8. <br />274° <br />44' <br />00" <br />14.35 <br />feet to a point; <br />9. <br />254' <br />38' <br />30" <br />13.29 <br />feet to a point; <br />10. <br />236' <br />13' <br />00" <br />20.37 <br />feet to a point; <br />11. <br />243' <br />59' <br />30" <br />16.11 <br />feet to a point; <br />12. <br />253' <br />03' <br />00" <br />30.33 <br />feet to a point; <br />13. <br />240' <br />53' <br />30" <br />13.33 <br />feet to a point; <br />14. <br />262° <br />00' <br />00" <br />35.79 <br />feet to a point; <br />15. <br />251* <br />49' <br />00" <br />20.85 <br />feet to a point; <br />16. <br />257' <br />56' <br />30" <br />41.77 <br />feet to a point; <br />17. <br />260° <br />11' <br />30" <br />22.35 <br />feet to a point; <br />18. <br />256' <br />06' <br />30" <br />29.82 <br />feet to a point; <br />19. <br />251' <br />59' <br />30" <br />67.58 <br />feet to a point; <br />20. <br />255° <br />37' <br />00" <br />84.44 <br />feet to a point; <br />Thence, <br />for the next <br />eight (8) <br />courses along Lot A, and the remainder of Royal Patent <br />1669, <br />Land Commission <br />Award <br />8516-13, Apana 3 to Kamaikui: <br />21. <br />259' <br />41' <br />37" <br />336.65 <br />feet to a point; <br />22. <br />255' <br />28' <br />24" <br />226.93 <br />feet to a point; <br />23. <br />273' <br />39' <br />35" <br />242.13 <br />feet to a point; <br />-2- <br />