My WebLink
|
Help
|
About
|
Sign Out
Home
RES 017 Draft 01 2010-2012
ClerkCouncil
>
Council Records
>
Resolutions
>
2010-2012
>
RES 017 Draft 01 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 1:40:39 PM
Creation date
12/22/2010 3:56:26 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2010-2012
Bill/Resolution
017
Draft
1
Introducer
Councilmember Brenda Ford
Referred To
FC
Action 1
FC-10: Recommends adoption of Res. 17-11, as amended to Draft 2 - 01/03/2011
Document Relationships
AGE FC 01/03/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Finance Committee (FC)
COM 0031.000 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GRANT DESCRIPTION PAGE # <br />GRANT OBJECTIVES <br />Objectives are tasks or activities conducted in order to accomplish the grant goal(s) (e.g., develop permanent fitting <br />stations for child restraints, enforcement activities, educational activities, etc.). Grant objectives should be stated in <br />measurable terms ( i.e., a percent reduction, number of training to be held, number of roadblocks, etc.), be concise and <br />deal with a specific item, be realistic with a reasonable probability of achievement, and be related to a specific timeframe <br />(a "by" date). Please notate baseline from which the reduction/increase will result. <br />Objective l: Get grant approved and acquire $20,350 grant by October 1, 2010. <br />The following objectives are contingent on an October 1, 2010 grant implementation date. <br />Objective 2: Go through pertinent County procurement process to purchase 100 GPS units within the grant amount by <br />end of October 2010. <br />Objective 3: Deliver the 100 GPS units to HPD -Traffic Services Section by November 2010. <br />Objective 4: Work with HPD to have them start using the proper street names as shown on County GIS maps for traffic <br />crash reporting/editing by December 2010. <br />Objective 5: HPD to learn and implement the use of the GPS units for traffic crash location reporting by end of December <br />2010. <br />Objective 6: HPD to start using the GPS units for all crash location reporting for the 2011 calendar year — start using by <br />January 2011. <br />Objective 7: Work with HPD -Traffic Services Section to come up with a comma separated format that includes GPS <br />coordinates for their crash reports to be used to upload into RoadSoft GIS by January 2011. <br />Objective 8: Work with HPD to ensure that the fields in Objective 7 are filled out in every report by January 2011. <br />Objective 9: Generate traffic crash frequency top 50 locations list and other crash trend reports using RoadSoft GIS by <br />January 2012. <br />Objective 10: Using top 50 accident frequency list, collect respective AADTs as needed to get top crash rate locations. <br />Objective 11: Plan and budget for safety improvement projects based on top crash rate locations by April 2012. <br />METHOD OF EVALUATION <br />Using data gathered throughout the grant period, the grant manager will evaluate (1) how well the stated grant goals and <br />objectives were accomplished, and (2) was the grant cost effective? How are you going to show effectiveness of your <br />project? What will be the impact of the project on your identified problem and goal(s)? Provide details on the method of <br />evaluation. <br />The effectiveness of the project will be exhibited using weekly, monthly, or quarterly progress reports that reflect project <br />status and whether the targeted objectives are being met. <br />The included Schedule C document can be used to track the milestones for the project and the dates that the milestones are <br />reached. <br />The HPD traffic crash reports will contain GPS coordinates that will help describe the traffic crash locations. The percent <br />of the traffic crash reports that include GPS coordinates will be a barometer to determine areas where improvements in <br />GPS reporting can be made. <br />RoadSoft GIS traffic crash frequency, rate, and trend reports can be generated using the updated HPD traffic crash data. <br />Our Annual Traffic Safety Report will summarize the traffic crash analysis data for the year and the respective projects <br />that are being planned based on said data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.