My WebLink
|
Help
|
About
|
Sign Out
Home
RES 074 Draft 01 2010-2012
ClerkCouncil
>
Council Records
>
Resolutions
>
2010-2012
>
RES 074 Draft 01 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2011 1:33:17 PM
Creation date
5/5/2011 12:22:23 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2010-2012
Bill/Resolution
074
Draft
01
Introducer
K. Angel Pilago, Council Member
Referred To
COUNCIL
Action 1
Council: Adopts Res. 74-11 - 05/17/11
Status
Adopted
Date To Mayor or Adoption Date
5/17/2011
Reading Number
1
Reading Date
5/17/2011
Ayes
9-Blas;Ford;Hoffmann;Ikeda;Onishi;Pilago;Smart;Yagong;Yoshimoto
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 05/17/2011 2010-2012 SPECIAL MEETING
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0200.000 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
COM 0200.000 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Improvement District, and the installation of meters for each currently existing <br /> assessment unit within the Improvement District. <br /> b. No Acquisition of Land Required; Required Easements. The construction <br /> and installation of the water system for the Improvement District will not require the <br /> acquisition of land. However, an easement over the privately -owned subdivision roads <br /> will be required for maintenance and operation of the water system. In addition, an <br /> easement or other agreement to use and occupy an area within the Mamalahoa Highway <br /> right -of -way will also be required for a portion of the water system. <br /> c. Material to be Used. The materials to be used in the construction and <br /> installation of the special improvements are set forth in the Manager's Report, and <br /> include, without limitation, the following: <br /> i. 1,022 linear feet of 8 -inch ductile iron waterline; <br /> ii. 3,620 linear feet of 6 -inch ductile iron waterline; <br /> iii. Seven fire hydrants; <br /> iv. Eleven Type "A" service laterals; <br /> v. Thirty -five Type "C" service laterals; <br /> vi. One pressure reducing valve station; and <br /> vii. Miscellaneous valves and fittings. <br /> d. Proposed Assessment Unit; Method of Assessment; Minimum Number of <br /> Installments. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.