My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 207 Draft 02 1996-1998
ClerkCouncil
>
Council Records
>
Bills
>
1996-1998
>
BIL 207 Draft 02 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 11:26:17 AM
Creation date
7/1/2011 9:56:00 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
1996-1998
Bill/Resolution
207
Draft
02
Introducer
Bobby Jean Leithead-Todd, Council Member
Referred To
PC
Action 1
Presented: PC - 3/17/98
Action 2
PC: Amends Bill 207, Draft 2 to Draft 3 - 03/17/98
Document Relationships
COM 0750.001 1996-1998
(Related To)
Path:
\Council Records\Communications\1996-1998
REP PC 102 03/17/1998 1996-1998
(Related)
Path:
\Council Records\Reports\1996-1998\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />[K]hl. Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria <br />for imposition of exactions or the assessment of impact fees, conditions included <br />herein shall be credited towards the requirements of the Unified Impact Fees <br />Ordinance. <br />[L]Q. Comply with all applicable laws, rules, regulations and requirements of affected <br />agencies for approval of the proposed development within the subject property. <br />[M]P. An initial extension of time for the performance of conditions within the <br />ordinance may be granted by the Planning Director upon the following <br />circumstances: <br />1. The non-performance is the result of conditions that could not have been <br />foreseen or are beyond the control of the applicant, successors or <br />assigns, and that are not the result of their fault or negligence. <br />2. Granting of the time extension would not be contrary to the General Plan <br />or Zoning Code. <br />3. Granting of the time extension would not be contrary to the original <br />reasons for the granting of the change of zone. <br />4. The time extension granted shall be for a period not to exceed the period <br />originally granted for performance (i.e., a condition to be performed <br />within one year may be extended for up to one additional year). <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.