My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 270 Draft 03 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 270 Draft 03 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2012 9:29:24 AM
Creation date
7/12/2011 10:00:18 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
270
Draft
03
Introducer
Dominic Yagong, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 270, Draft 3 passes first reading; adopts PWPRC-22 - 07/07/11
Action 2
Council: Bill 270, Draft 3 passes second & final reading - 07/22/11
Action 3
Council: Postpones reconsideration of Bill 270, Draft 3 to 09/21/11 - 08/17/11
Action 4
Council: Bill 270, Draft 3 postponed to 10/05/11 Council Meeting - 09/21/11
Action 5
Council: Bill 270, Draft 3 held over to the 10/19/11 Council Meeting - 10/05/11 See sticky note for more actions.
Date To Mayor or Adoption Date
8/2/2011
Reading Number
1
Reading Date
7/7/2011
Ayes
8-Blas;Ford;Hoffmann;Ikeda;Onishi;Smart;Yagong;Yoshimoto
Noes
0
Absent
1-Pilago
Excused
0
Reading Number .
2
Reading Date .
7/22/2011
Ayes .
5-Blas;Ford;Hoffmann;Pilago;Smart
Noes .
4-Ikeda;Onishi;Yagong;Yoshimoto
Absent .
0
Excused .
0
Reading Number ..
3
Reading Date ..
11/2/2011
Document Relationships
AGE COUNCIL 07/22/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 09/21/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 10/05/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 10/19/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 11/02/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0128.002 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
COM 0128.002 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 -42. Required inspections. <br /> The building official, upon notification from the permit holder or the permit holder's agent, shall <br /> make the following inspection and shall either approve that portion of the construction as completed or <br /> shall notify the permit holder or the permit holder's agent if the same fails to comply with this code: <br /> (1) Footing and foundation inspections shall be made after excavations for footings are <br /> complete and any required reinforcing steel is in place. For concrete foundations, any <br /> required forms shall be in place prior to inspection. Materials for the foundation shall be <br /> on the job, except where concrete is ready mixed in accordance with ASTM C 94, the <br /> concrete need not be on the job. <br /> (2) Concrete slab and under -floor inspections shall be made after in -slab or under -floor <br /> reinforcing steel and building service equipment, conduit, piping accessories and other <br /> ancillary equipment items are in place, but before any concrete is placed or floor <br /> sheathing installed, including the subfloor. <br /> (3) Framing inspections shall be made after the roof deck or sheathing, all framing, <br /> fireblocking and bracing are in place and pipes, chimneys and vents to be concealed are <br /> complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. <br /> (4) Lathing inspections, to be made after all lathing and gypsum board, interior and exterior, <br /> in construction required to be fire- resistive is in place but before any plastering is applied <br /> or before gypsum board joints and fasteners are taped and finished. <br /> Exception: Lath and gypsum board installed in Group R, Division 3 and Group U <br /> Occupancies. <br /> Section 5 -43. Final inspection. <br /> The final inspection shall be made after all work required by the building permit is completed. <br /> Section 5 -44. Special inspections. <br /> For special inspections, see Section 1704 and 1707. <br /> Section 5 -45. Certificate of occupancy. <br /> (a) Certificate Requirement. No building or structure shall be used or occupied, and no change in the <br /> existing occupancy classification of a building or structure or portion thereof shall be made until the <br /> building official has issued a certificate of occupancy therefor as provided herein. Issuance of a <br /> certificate of occupancy shall not be construed as an approval of a violation of the provisions of this <br /> code or of other ordinances of the jurisdiction. <br /> Exception: Group R, Division 3 and Group U occupancies will not be issued a certificate of <br /> occupancy. <br /> (b) Certificate Issuance. After the building official inspects the building or structure and finds no <br /> violations of the provisions of this code or other laws that are enforced by the department of public <br /> works, the building official shall issue a certificate of occupancy that contains the following: <br /> (1) The building permit number. <br /> (2) The address of the structure. <br /> (3) The name and address of the owner. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.