My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0279.000 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0279.000 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 10:57:06 AM
Creation date
7/22/2011 9:03:33 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0279
Point
000
Author
Colleen Schrandt, Leg. Auditor
Communications - Referred To
PWPRC
Comments
GRC: Close file 8/2/2011
Document Relationships
AGE PWPRC 08/02/2011 2010-2012
(Related)
Path:
\Council Records\Agendas\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br /> Limited Scope Performance Audit of the <br /> Department of Parks and Recreation's Facilities Asset Management <br /> [Conducted in accordance with Generally Accepted Government Auditing Standards (GAGAS)] <br /> This limited scope performance audit examines the Department of Parks and Recreation's asset <br /> management of recreational facilities, including maintenance and repair, and its progress in <br /> meeting the goals for facilities, fiscal responsibility, and safety set forth in its 2004-2009 <br /> Strategic Plan. The County's recreational facilities are public assets acquired through the <br /> investment of public tax dollars. County officials are stewards of these public assets, and their <br /> decisions about how public facilities are used, operated, maintained, retired, or replaced can <br /> have far-reaching financial and social consequences. Currently, certain recreational facilities <br /> cannot be fully utilized by the public in their existing condition; games have had to be stopped <br /> due to leaking roofs; other major events have been impacted by facility conditions; and facilities <br /> or parts of facilities have been closed due to hazardous materials safety issues. <br /> Nationwide, many government jurisdictions and their constituents are experiencing the <br /> consequences of deferring maintenance and repair of public assets and infrastructure. In <br /> Hawaii County, the current Parks and Recreation Administration and Parks Maintenance <br /> Division have inherited the responsibility for managing deteriorated facilities with a backlog of <br /> critical maintenance and repairs. Many of the County's older recreational facilities require <br /> rehabilitation due to the long history of deferred maintenance, prior construction with materials <br /> now determined to be hazardous, and new Americans with Disabilities Act (ADA) access <br /> requirements. <br /> Although we observed Parks Maintenance Division staff diligently performing custodial activities <br /> and completing routine work orders, the Department's reactive processes and procedures for <br /> critical maintenance and insufficient proactive processes and procedures for periodic critical <br /> maintenance have contributed to deteriorating facilities. Critical periodic maintenance — <br /> including roof painting and repair and termite treatment— has been inadequate as evidenced by <br /> leaking roofs at 11 of the 16 recreational sites visited by the auditors, and termite infestation <br /> reported by facility staff at 6 of the 16 sites. Critical maintenance and repair deficiencies were <br /> observed by the auditors or reported by facility staff at 15 of the16 sites visited, with certain <br /> deficiencies being reported but left uncorrected for several years. <br /> The interrelated processes of planning, budgeting, operations, and monitoring necessary for the <br /> upkeep of public facilities and effective asset management need to be integrated by the <br /> Department of Parks and Recreation. The Department's current system of asset management <br /> is ineffective, with the Department lacking a detailed facility inventory, condition assessment, <br /> and repair cost estimates to provide the information necessary to develop adequate plans and <br /> budgets. The Department does not have an asset management plan for recreational facilities, a <br /> plan to reduce the backlog of deferred maintenance and repairs, a written plan to remediate <br /> hazardous materials with interim safety measures, and an annual work plan scheduling <br /> proactive preventative maintenance of critical facility components. <br /> While the Department of Parks and Recreation roughly estimated costs to remediate its <br /> deferred maintenance backlog at approximately $80 million, $1.3 million of appropriated and <br /> allocated CIP funding for Repairs/Improvements is scheduled to lapse unused on June 30, <br /> 2011. The Department's Operating Budget is not based on actual maintenance and repair <br /> needs, with the Parks Maintenance Division's Miscellaneous Contract Services account for roof <br />
The URL can be used to link to this page
Your browser does not support the video tag.