My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2011-069 2010-2012
ClerkCouncil
>
Council Records
>
Ordinances
>
2011
>
ORD 2011-069 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2011 2:22:37 PM
Creation date
8/30/2011 8:34:37 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2010-2012
Year
2011
Ordinance
069
Effective Date
11/15/2011
Document Relationships
BIL 268 Draft 03 2008-2010
(Related)
Path:
\Council Records\Bills\2008-2010
BIL 268 Draft 03 2008-2010
(Related To)
Path:
\Council Records\Bills\2008-2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any and every owner, contractor or other person engaged in construction of the <br />building or structure, or otherwise, covering or allowing to be covered such <br />portion of work or equipment, or removing any notice not to cover same placed <br />thereon by the [administrative authority] authority having jurisdiction shall <br />likewise be liable to the penalties provided for in this chapter. <br />SECTION 9. Chapter 9, article 2, section 9 -12 of the Hawai`i County Code 1983 (2005 <br />Edition, as amended) is amended to read as follows: <br />Section 9 -12. Final inspection required. <br />(a) No person shall use or supply electrical energy to any electrical installation on <br />the provisions of this chapter before the administrative authority has approved <br />such installation, and all code and permit requirements of the Hawai`i County <br />Code relating to Building (chapter 5), Electricity (chapter 9), Affordable Housing <br />applicable to the use and /or structure have been satisfied. <br />EXCEPTION: <br />commercial installations, provided all of the following conditions are met: <br />The service main disconnect must be capable of being padlocked in the open <br />position; <br />There must be a need to test the installation; and <br />The electrical contractor must remain in direct control of the installation while it <br />is energized. <br />Permission may be granted for testing to proceed for ten day periods, not to exceed thirty <br />days total. When testing is completed or the permitted amount of testing time has <br />service disconnect in the open position. <br />A final inspection is required after all work required by the electrical permit is completed <br />and complies with all the requirements of this chapter. <br />(b) [Whenever electric wiring has been approved, a ] A certificate of inspection <br />[therefor shall] may be issued [on demand, ] upon request by the electrical <br />contractor on record, provided all fees required by this chapter have been [paid.] <br />satisfied. <br />(c) The supervising electrician shall be present on the job site upon the request of the <br />[administrative authority.] authority having jurisdiction. <br />(d) Any installation in violation of this section shall be subject to discontinuance of <br />electrical service by the administrative authority.] <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.