Laserfiche WebLink
REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 8/1/11 - 8/15/11 <br />Execution <br />Date <br />Job <br /># <br />Contract <br /># <br />Project <br />Title <br />Contract <br />Type <br />Dept. <br />Original <br />Contract <br />Amount <br />Original <br />Contract <br />Date <br />CO /SA <br />No. <br />CO /SA <br />Amount <br />% of <br />Orig <br />Cout <br />Cummulalive <br />CO /SA <br />Total <br />% of <br />Orig <br />Cont <br />Contractor <br />Project <br />Manager <br />Project <br />Status <br />Purpose <br />8/10/2011 <br />N/A <br />C.002699 <br />Archaeological <br />services <br />PS <br />DPW <br />$241,650.00 <br />2/23/2010 <br />3 <br />$33,920.30 <br />14.04% <br />$336,420.30 <br />139.22% <br />Pacific Legacy <br />Inc <br />Warren Lee <br />Open <br />To prepare a Preservation Plan and <br />Burial Treatment for the Historic <br />Preservation Area. Scope of work <br />was not known until the <br />Archaeological Inventory Survey <br />Report was completed in March <br />2011. Work is being performed per <br />the Ane Keohokalole Section 106 <br />Memorandum of Agreement signed <br />by Mayor on 11/13/09. This work is <br />eligible for 100% ARRA funding. <br />8/10/2011 <br />P -3944 <br />C.002698 <br />Ane Keohokalole Hwy, <br />Hina Lani Street to <br />Palani Rd. FAP No. <br />ARR- 1880(1) <br />C <br />DPW <br />$29,893,336.76 <br />2/22/2010 <br />11 <br />$562,860.00 <br />° <br />1.88 /° <br />$1,651,571.20 <br />° <br />5.52 /o <br />Nan, Inc. <br />Ben Ishii <br />Engineering <br />Div. <br />Open <br />Dryland Forest Mitigation <br />requirements imposed by USFWS <br />after bid opening. Eligible for 100% <br />federal funding. <br />8/11/2011 <br />State <br />57122 <br />C.002889 <br />HOVE Water Facilities <br />Project <br />C <br />DPW/ <br />DWS <br />$3,395,813.00 <br />5/16/2008 <br />2 <br />$14,850.00 <br />0.44% <br />$414,850.00 <br />12.22% <br />Bolton Inc. <br />Shari Uyeno, <br />DWS <br />Open <br />To install one (1) Type "B" Fire <br />Hydrant, Detail FH3, per the Water <br />Systems Standards 2002, as <br />amended. <br />Total # of <br />Contracts <br />7 <br />Total Original Contract <br />Amount <br />$35,630,980.98 <br />Total CO /SA <br />for Period <br />7 <br />Total CO /SA <br />Amount for Period <br />$1,092,378.19 <br />