My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 304 Draft 03 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 304 Draft 03 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 2:10:21 PM
Creation date
9/9/2011 2:37:21 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
304
Draft
03
Introducer
Pete Hoffmann, Council Member
Referred To
PC
Action 1
Council: Bill 304, Draft 3 amended to Draft 4 - 09/21/11
Reading Number
1
Reading Date
9/21/2011
Document Relationships
AGE COUNCIL 09/21/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0040.011 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
COM 0040.011 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Meter Size <br />Wastewater Impact Fee <br />5/8" x 3/4" Meter <br />$1,892 <br />1" Meter <br />$4,731 <br />1 -1/2" Meter <br />$9,463 <br />2" Meter <br />$15,140 <br />3" Meter <br />$30,281 <br />4" Meter <br />$47,315 <br />6" Meter <br />$94,629 <br />8" Meter <br />$151,407 <br />10" Meter <br />$274,425 <br />(b) The fees set out in subsection (a) shall be adjusted annually to account for inflation. At <br />the end of each calendar year, the impact fee administrator shall prepare an adjusted fee <br />schedule, which will be posted on the County's website and be made publicly available. <br />The adjusted fee schedule will go into effect on January 1 of the following year. <br />(c) The adjustment factor shall be the ratio of the appropriate cost index for the quarter <br />during which the adjustment is made (even if projected) to the same cost index for the <br />quarter during which the fees were last adopted, updated or adjusted. The appropriate <br />cost indices shall be as follows from the most recent edition of the U.S. Army Corps of <br />Engineers, Civil Works Construction Cost Index System, utilizing the Hawaii <br />adjustment factors: <br />(1) For road impact fees, the roads, railroads and bridges index; <br />(2) For parks and recreation impact fees, the recreation facilities index; and <br />(3) For fire /EMS, police, solid waste, and wastewater impact fees, the buildings, <br />grounds and utilities index. <br />In the event that the referenced cost indices are not available, the updates shall be based <br />on reasonable alternative indices as determined by the impact fee administrator. <br />(d) Impact fees due and payable shall be net of any approved offsets available pursuant to <br />section 36 -17, post- ordinance credits, and section 36 -18, pre- ordinance offsets. It shall <br />be the responsibility of the applicant to claim offsets prior to payment of impact fees. <br />Any offsets not claimed shall be deemed waived. <br />(e) If the type of impact - generating development is not specified on the above schedule, the <br />impact fee administrator shall determine the fee on the basis of the fee applicable to the <br />most nearly comparable type of land use on the fee schedule. In the case of road impact <br />fees, the impact fee administrator shall be guided in the selection of a comparable type of <br />land use by trip generation rates contained in the most current edition of the report titled <br />"Trip Generation," prepared by the Institute of Transportation Engineers (ITE), or articles <br />or reports appearing in the ITE Journal. <br />(f) In general, impact fees shall be assessed based on the principal use of a building or lot. <br />For example, a warehouse that contained a small administrative office would be assessed <br />at the warehouse rate for all of the square footage. Shopping centers are assessed at the <br />retail /commercial rate, regardless of the type of tenants. For a true mixed -use <br />development, such as one that includes both residential and nonresidential development, <br />
The URL can be used to link to this page
Your browser does not support the video tag.