My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 304 Draft 03 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 304 Draft 03 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 2:10:21 PM
Creation date
9/9/2011 2:37:21 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2008-2010
Bill/Resolution
304
Draft
03
Introducer
Pete Hoffmann, Council Member
Referred To
PC
Action 1
Council: Bill 304, Draft 3 amended to Draft 4 - 09/21/11
Reading Number
1
Reading Date
9/21/2011
Document Relationships
AGE COUNCIL 09/21/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0040.011 2010-2012
(Related To)
Path:
\Council Records\Communications\2010-2012
COM 0040.011 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 36 -14. Independent fee calculation formulae. <br />(a) The independent fee calculation study shall be based on the same service standards and <br />unit costs for facilities used in the needs assessment study (as adjusted by the same cost <br />inflation factors used in annual adjustments since the study was prepared), and shall <br />document the methodologies and assumptions used. <br />(b) An independent fee calculation study submitted for the purpose of calculating a road <br />impact fee may be based on data, information, or assumptions from independent sources, <br />provided that: <br />(1) The independent source is an accepted standard source of transportation <br />engineering or planning data; or <br />(2) The independent source is a local study on trip characteristics carried out by a <br />qualified transportation planner or engineer pursuant to an accepted methodology <br />of transportation planning or engineering. <br />(c) The independent fee calculation is the sum of the road impact fees, the parks and <br />recreation impact fees, the fire /EMS impact fees, police impact fees, solid -waste impact <br />fees, and wastewater impact fees. The formulae for calculation of these fees are listed <br />below. <br />(1) The road impact fees shall be calculated according to the following formula: <br />ROAD IMPACT FEE = VMT x NET COST/VMT <br />Where: <br />VMT <br />= <br />TRIPS x % NEW x LENGTH _ 2 <br />NET COST /VMT <br />= <br />COST/VMC x VMC/VMT - CREDIT/VMT <br />TRIPS <br />= <br />Trip ends during an average weekday <br />% NEW <br />= <br />Percent of trips that are primary trips, as opposed to pass -by or <br />diverted -link trips <br />LENGTH <br />= <br />Average length of a trip on the major road facilities <br />2 <br />= <br />Avoids double- counting trips for origin and destination <br />COST/VMC <br />= <br />Average cost to add a new daily vehicle -mile of capacity <br />VMC/VMT <br />= <br />System -wide ratio of VMC to VMT on the major road facilities <br />(assumed 1:1) <br />CREDIT /VMT <br />= <br />DEBT /VMT + PAST/VMT + GRANT/VMT <br />DEBT /VMT <br />= <br />Outstanding debt used for capacity improvements on existing road <br />facilities divided by total existing VMT <br />PAST /VMT <br />= <br />The net present value of property taxes paid over the last five years <br />by vacant land for road capacity improvements, including general <br />fund expenditures as well as debt service payments, per VMT <br />GRANT /VMT <br />= <br />The net present value of future Federal and State road capacity <br />funding anticipated to be forthcoming per VMT over the next 20 <br />years <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.