My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0128.074 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0128.074 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2011 3:08:14 PM
Creation date
10/5/2011 8:02:12 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0128
Point
074
Author
Brittany Smart, Council Member
Communications - Referred To
COUNCIL
Comments
Council: Held over - 10/05/11 Council: Postponed - 10/19/11 Council: Close file - 11/02/11
Document Relationships
AGE COUNCIL 10/19/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
AGE COUNCIL 11/02/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not exceed 12'0 ". [ - •• - !" - - - • - -.] (Building <br />cannot be located within building setback as required by the Zoning, Chapter 25, of Hawaii County <br />Code. Verify setback requirements with the Planning Department). <br />(19) Detached decks or platforms less than 30" in height above grade. (Building cannot be located <br />within building setback as required by the Zoning, Chapter 25 of Hawaii County Code. Verify <br />setback requirements with the Planning Department). <br />R1911(20) Playground equipment, excluding assembly or similar waiting areas. <br />[(204](21) Replacement of solar water heating components (i.e. panels, tanks) in the same location and of the <br />same type, however; plumbing and /or electrical permits required. <br />[(21)](22) Wells and Reservoirs — Hawai'i Revised Statutes, chapter 178. Check requirements of other <br />governmental agencies. <br />[(22)1(23) Work performed under the jurisdiction or control of the State Department of Accounting and General <br />Services (DAGS)." <br />3. Section 5 -22 of Bill No. 270, Draft 3, is amended to read as follows: <br />"Section 5-22. Expiration. <br />(a) Every permit issued by the building official under the provisions of this code shall expire by limitation and <br />become null and void (i) three (3) years after the date of issuance, or (ii) 120 days from the date of issuance <br />if the building or work authorized by the permit is [ .] suspended or <br />abandoned for a period of 120 days or more at any time after the work has commenced. ["nit <br />] In the event of strikes or other causes <br />beyond the control of the builder, the building official may extend the aforementioned three (3) year or 120 <br />day periods. The extension of time granted shall be a reasonable length of time but in no case exceed six (6) <br />months. Requests for an extension must be made in writing to the building official. No exceptions will be <br />allowed for building permits issued prior to the adoption of this code. <br />(b) Upon expiration of a permit, all work shall cease and shall not be recommenced until a new permit is <br />obtained. The building official may waive the requirements for submittal of plans and specifications in <br />connection with a permit renewal if the work previously permitted remains the same, no amendments have <br />been made to the building code affecting the work, and previously approved plans are still on file. When the <br />building official determines that plans need not be submitted, the original plans, stamped and approved by <br />the building official, shall be the renewed permit plans. <br />(c) An owner - builder permit shall expire by limitation and become null and void five (5) years after the <br />date of issuance. If the building or work authorized by the permit is suspended or abandoned any <br />time after the work has commenced, the building official, upon request, may suspend the permit <br />expiration until such a time that the owner - builder is ready to re- commence building or work <br />authorized by approved permit." <br />
The URL can be used to link to this page
Your browser does not support the video tag.