Laserfiche WebLink
REPORT OF CHANGE ORDERS AUTHORIZED <br />FOR THE PERIOD OF: 9/16/11- 9/30/11 <br />Legend: <br />CO <br />Change Order <br />SA <br />Supplemental Agreement <br />PS <br />Professional Services <br />C <br />Construction <br />PTA <br />Price Term Agreement <br />GS <br />Other Goods & Services <br />Execution <br />Date <br />Job <br /># <br />Contract <br /># <br />Project <br />Title <br />Contract <br />Type <br />Dept. <br />Original <br />Contract <br />Amount <br />Original <br />Contract <br />Date <br />CO /SA <br />No. <br />CO /SA <br />Amount <br />% of <br />Orig <br />Cont <br />Cummulative <br />CO /SA <br />Total <br />% of <br />Orig <br />Cont <br />Contractor <br />Project <br />Manager <br />Project <br />Status <br />Purpose <br />9/16/2011 <br />RFP -2657 <br />C.002995 <br />Kalapana Viewing Site <br />Management Services <br />GS <br />Parks <br />$145,848.98 <br />12/15/2010 <br />2 <br />$65,670.57 <br />45.03% <br />$131,341.14 <br />90.05% <br />Jan Guard <br />Hawaii Inc. <br />Gilbert <br />Benevides <br />Open <br />2nd Supplemental agreement for an <br />additional 3 month extension period <br />from 9/16/11-12/15/11. <br />9/16/2011 <br />B -3648 <br />C.002964 <br />Pahala Ballfield <br />Accessibility <br />Improvements <br />C <br />DPW <br />$292,463.00 <br />10/8/2010 <br />1 <br />- $3,000.00 <br />- 1.03% <br />- $3,000.00 <br />- 1.03% <br />Bolton Inc. <br />Ochi, <br />P &R <br />Open <br />Time extension due to delays in <br />fabrication and shipping of bleachers; <br />assessment of liquidated damages. <br />9/21/2011 <br />B -3647 <br />C.003097 <br />Punaluu Park <br />Acessibility <br />Improvements <br />C <br />DPW <br />$102,609.00 <br />4/26/2011 <br />1 <br />$1,536.35 <br />1.50% <br />$1,536.35 <br />1.50% <br />Site <br />Engineering <br />Inc. <br />Jeff Ochi, <br />P &R <br />Open <br />Two existing electrical conduits that <br />were not shown on the plans were <br />damaged during the demolition of the <br />existing concrete slab and needed to <br />be replaced. <br />9/19/2011 <br />WW -4056 <br />C.003178 <br />Project 19 Sewage <br />Pump Station Wet <br />Well Improvements. <br />C <br />DPW <br />$23,985.00 <br />6/29/2011 <br />1 <br />- $570.00 <br />- 2.38% <br />- $570.00 <br />- 2.38% <br />Keauhou Kona <br />Construction <br />Corp. <br />Rizalino <br />Mangaoang <br />Open <br />Project was satisfactorily <br />accomplished without invoking <br />Additive Alternate No. 1. Additional <br />material procurement was required to <br />address the unforeseen condition of <br />the existing wet well configuration. <br />9/21/2011 <br />B -3765 <br />C.002564 <br />DPW Facilities ADA <br />Compliance and <br />Improvements Phase <br />1 <br />C <br />DPW <br />$4,118,169.00 <br />7/29/2009 <br />4 <br />$199.00 <br />° <br />0.00 /° <br />$10,392.00 <br />0.25% <br />Site <br />Engineering, <br />Inc. <br />James <br />Imanaka, <br />Building <br />Division <br />Open <br />Re -key Waimea Police Station <br />exterior doors lockset cylinders to <br />accommodate staff keys. <br />9/23/2011 <br />B -3893a <br />R) <br />C.003176 <br />South Hilo Baseyard <br />Improvements, Phase <br />1 <br />C <br />DPW <br />$544,631.21 <br />6/29/2011 <br />1 <br />$3,334.39 <br />0.61% <br />$3,334.39 <br />0.61% <br />Heartwood <br />Pacific, LLC <br />Daren <br />Kodani, <br />Building <br />Division <br />Open <br />Extend metal roofing up the ridge to <br />provide required support for new <br />ridge cap, roof anchor and roof <br />ventilators. <br />