My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0454.001 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0454.001 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 10:44:00 AM
Creation date
12/1/2011 1:11:37 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0454
Point
001
Author
Darren J. Rosario, Fire Chief
Communications - Referred To
COUNCIL
Comments
Council: Close file - 12/07/11
Document Relationships
AGE COUNCIL 12/07/2011 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
REP HSSPSC 005 11/15/2011 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Human & Social Services, & Public Safety Committee (HSSPSC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3 [a]) <br />Places of assembly with an occupancy load of 300 or greater. Permit shall be <br />kept on site and available for review by the AHJ during normal business hours. <br />Permit and fee for section 25.1.2 are as follows: <br />fa) There shall be a permit and fee of $25.00 for each tent, canopy, or <br />temporary structure covering an area of 700 square feet or greater. Tents <br />or canopies located less than 10 feet between tie -downs shall be <br />considered as one tent when determining square footage. <br />Exception: These permits and fees shall not apply to structures used for <br />camping or private functions onprivate property or to any section <br />10.15.1 permit. <br />(b) A permit and fee of $25.00 for each tent or temporary structure erected <br />for the sale of Christmas trees. Tents greater than 10 feet apart shall be <br />considered a separate tent. <br />(c) A permit and fee of $25.00 for each tent or temporary structure erected <br />for the sale of Fireworks. Tents greater than 10 feet apart shall be <br />considered a separate tent. <br />ns on private property or to any section <br />10.15.1 permit.] <br />(4) Permit and fee for section 42.5.2.2.4 are as follows: <br />A one -time permit and fee of $50.00 dollars for each 42.5.2.2.4 permit, <br />Liquefied Petroleum Gas tank installation of 125 gallons or greater. <br />(5) Permit and fee for section 43.1.1.4 are as follows: <br />An annual permit and fee of $50.00 for each 43.1.1.4 permit, Application of <br />flammable finishes. <br />(6) Permit and fee for section 65.11.3.2 are as follows: <br />Permits, licenses, and fees associated with the Import, Manufacture, Wholesale, <br />Storage, Retail, and use of fireworks shall be as specified in HRS 132 -D. <br />(7) Permit and fee for section 66.1.5 are as follows: <br />A one -time permit and fee of $50.00 for each 66.1.5 permit, installation and /or <br />removal of an above - ground storage tank (AST) or under - ground storage tank <br />(UST) containing flammable or combustible liquids in excess of 60 gallons." <br />RATIONALE: Added "lessee" to (1)(b), moved the language for "Exceptions" to its proper place <br />and reformatted. <br />5. Section 26 -14, as provided in Bill No. 139, is amended to read: <br />"Section 26 -14. Plan Review. <br />1.14 and 1.14.1 is added to read: <br />1.14 Plan Review <br />1.14.1 When required by HRS 132 -9, a set of plans and specifications shall be <br />submitted to the Fire Chief for review to assure compliance with applicable codes <br />and standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.