My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 270 Draft 07 2008-2010
ClerkCouncil
>
Council Records
>
Bills
>
2008-2010
>
BIL 270 Draft 07 2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2012 1:07:59 PM
Creation date
1/24/2012 9:32:36 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2010-2012
Bill/Resolution
270
Draft
07
Introducer
Brittany Smart, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 270, Draft 7 held over pursuant to Council Rule 24(e) - 01/20/12
Action 2
Council: Bill 270, Draft 7 passes second and final reading - 02/01/12
Status
Adopted
Date To Mayor or Adoption Date
2/10/2012
Reading Number
2
Reading Date
2/1/2012
Ayes
5-Blas;Hoffmann;Ikeda;Pilago;Smart
Noes
2-Ford;Yagong
Absent
2-Onishi;Yoshimoto
Excused
0
Document Relationships
AGE COUNCIL 02/01/2012 2010-2012
(Related To)
Path:
\Council Records\Agendas\2010-2012\Council
COM 0128.133 2010-2012
(Related)
Path:
\Council Records\Communications\2010-2012
ORD 2012-027 2010-2012
(Related)
Path:
\Council Records\Ordinances\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exception. The Building Division will waive the requirements of plan and specification <br />review by the building official of pre- approved R -3 Occupancy package model homes previously <br />approved by the department of public works. <br />(b) When the building official issues the permit, the building official shall endorse in writing or stamp <br />on all sets of plans and specifications "REVIEWED." Such reviewed plans and specifications shall <br />not be changed, modified, or altered without authorization from the building official, and all work <br />shall be done in accordance with the approved plans. <br />(c) The building official may issue a permit for the construction of part of the building or structure <br />before the entire plans and specifications for the whole building or structure have been submitted or <br />approved, provided adequate information and detailed statements have been filed complying with <br />all pertinent requirements of this code. The holder of such permit shall proceed at the holder's own <br />risk without assurance that the permit for the entire building or structure will be granted. <br />(d) The building permit shall be posted in a conspicuous place on the site during the progress of work. <br />(e) No permit issued shall authorize any person or contractor to do work upon any phase of the <br />building, structure or project unless specifically identified in the permit application, including any <br />attachment or amendments thereto, as the contractor or subcontractor designated to do that <br />particular phase of work. <br />(f) If there is a change in the designation of any contractor for any phase of work subsequent to the <br />issuance of a permit, the permittee shall submit the change in writing to the building official <br />requesting approval of the change, and include a non - refundable payment of $25 for the transferring <br />of the building permit. <br />Section 5 -29. Reserved. <br />Section 5 -30. Reserved. <br />Division 4. Fees. <br />Section 5 -31. Permit fees. <br />A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment <br />to a permit be released until the addition fee, if any, has been paid. <br />(1) The fee for each permit shall be as set forth in section 5 -36, Table lA — BUILDING PERMIT <br />FEES. <br />(2) The determination of value or valuation under any of the provisions of this code shall be <br />made by the building official. The valuation to be used in computing the permit fees shall be <br />the total value of all construction work for which the permit is issued, as well as all finish <br />work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire - <br />extinguishing systems and any other permanent work or permanent equipment. <br />When work for which a permit is required by this code has commenced without obtaining <br />said building permit, the fees specified shall be doubled, but the payment of such double fee <br />shall not relieve any person from fully complying with the requirements of this code in the <br />execution of the work nor from any other penalties prescribed in this code. <br />(3) <br />Section 5 -32. Refunds. <br />Refunds for permits shall be made in accordance with section 2 -12 of the Hawai`i County Code. <br />Section 5 -33. Compliance with Hawaii Revised Statutes. <br />Identity of Licenses. It shall be unlawful for any permittee to perform or allow to be performed, <br />any work covered by the permit issued in violation of chapter 444, Hawai`i Revised Statutes, relating to <br />the licensing of contractors. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.