My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2012-127 2010-2012
ClerkCouncil
>
Council Records
>
Ordinances
>
2012
>
ORD 2012-127 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 2:16:35 PM
Creation date
9/12/2012 1:16:38 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2010-2012
Year
2012
Ordinance
127
Effective Date
9/6/2012
Document Relationships
BIL 279 Draft 02 2010-2012
(Related)
Path:
\Council Records\Bills\2010-2012
BIL 279 Draft 02 2010-2012
(Related To)
Path:
\Council Records\Bills\2010-2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />FUEL TAX PROGRAM <br />REVENUE APPROPRIATION <br />Resolution 504 -08 INCREMENT 3 <br />2012 -2014 <br />ROADWAY PROJECTS (ENG) $1,650,000 <br />• ROAD IMPROVEMENT PROJECTS <br />➢ Kuakini Highway Widening (Hualalai to Hawaii Belt Road) <br />➢ Kapiolani Street Extension <br />➢ Mamalahoa Widening (N. Hawaii Community Hospital to Mudlane) <br />➢ Ali`i Highway <br />➢ Kamehameha Avenue Resurfacing (Wailoa Bridge to Ponahawai) <br />➢ Kawailani /Pohakulani /Ainaola & Kawailani/`Iwalani Traffic Signals <br />➢ Kaiminani Reconstruction <br />➢ Manono Street Bike and Pedestrian Improvements <br />➢ Kilauea Avenue Reconstruction <br />➢ Ali'i Drive Improvements Along Oneo Bay <br />➢ Laaloa Avenue Extension <br />➢ Mamalahoa Highway Safety Improvements <br />• ROADWAY ENCROACHMENT PROGRAM <br />• ROADWAY DRAINAGE IMPROVEMENT PROGRAM <br />• ROADWAY SAFETY IMPROVEMENT PROGRAM <br />• STATE DOT ADMINISTRATIVE SERVICE CHARGES <br />BRIDGE INSPECTION, REPAIR & REPLACEMENT PROGRAM (ENG) $1,500,000 <br />• BRIDGE INSPECTION PROGRAM <br />• BRIDGE REPAIR PROGRAM <br />• BRIDGE REPLACEMENT PROJECTS <br />➢ AIi`i Drive Culvert Replacement <br />A. Reed's Island Bridge Rehabilitation <br />➢ Konawaena School Culvert Replacement <br />➢ Kaahikini Bridge Rehabilitation <br />➢ Waikaalulu Gulch Bridge Rehabilitation <br />➢ Maili Stream Bridge (Kaiwiki Road) <br />ADA CURB CUT /ACCESSIBLE ROUTE PROGRAM (ENG) $200,000 <br />LOCAL ROAD IMPROVEMENTS (HWY) $3,350,000 <br />• Puna Roads ( 20.28 %) 679,245 <br />• South Hilo Roads ( 31.30 %) 1,048,430 <br />• North Hilo Roads ( 3.75 %) 125,575 <br />• Hamakua Roads ( 7.12 %) 238,500 <br />• North Kohala Roads ( 2.98 %) 99,960 <br />• South Kohala Roads ( 10.99 %) 368,268 <br />• North Kona Roads ( 13.88 %) 464,951 <br />• South Kona Roads ( 2.81% ) 94,111 <br />• Ka`u Roads ( 6.89 %) 230,960 <br />
The URL can be used to link to this page
Your browser does not support the video tag.