My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0838.001 2010-2012
ClerkCouncil
>
Council Records
>
Communications
>
2010-2012
>
COM 0838.001 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2021 3:03:57 PM
Creation date
10/1/2012 8:51:53 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2010-2012
Communication
0838
Point
001
Author
Dean Oshiro, President, DWE Inc.
Communications - Referred To
PWPRC
Document Relationships
REP PWPRC 123 09/18/2012 2010-2012
(Related)
Path:
\Council Records\Reports\2010-2012\Public Works & Parks & Recreation Committee (PWPRC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 11, 2011 County Electrical Code was voted in by the Council. <br /> November 14, 2011 Procedure 2011-01 was issued by the Plans Examining Manager of the Building Division. <br /> November 16, 2011 New County Electrical Code for electrical contractors is now in effect. <br /> November 16—Feb12 Permits were issued. PV Systems were installed. We received final inspection from the <br /> County Electrical and Building Inspectors. <br /> February 14, 2012 Received a call from Building Division Plan Reviewer,that our drawings(which were the <br /> same drawings previously permitted and inspected)were not detailed enough. <br /> February 15—May2 DWE, Inc. submitted new drawings with details, per verbal requirements, provided by the <br /> Plans Examining Manager. <br /> May 5, 2012 New, seven (7) page PV guideline memo was sent to us via email. <br /> May 14, 2012 Revised PV guidelines issued from the County. <br /> May 15, 2012 Revision to structural evaluation worksheet issued from the County. <br /> July 19, 2012 Two story homes and mounting system become an issue. Both will need architect or <br /> structural engineer stamps on drawings. <br /> July 20, 2012 Structural engineer was hired by Hawaii Energy Connection to review mounting system. <br /> August 16, 2012 Letter by a licensed structural engineer was submitted to the Plans Examining Manager, <br /> who is also an architect. <br /> August 16, 2012 Letter was rejected by the Plans Examining Manager. <br /> September 11,2012 New rail certification letter was sent to the County Building Division. <br /> September 12, 2012 A class was held for online permit applications. In class,Warren Lee stated that the <br /> certification letter submitted was approved. They will issue a bulletin posted on the <br /> County website stating its approval. <br /> September 14,2012 Submitted permit drawings to the clerks in the Building Division. Inquired if the Bulletin <br /> #2 (regarding rail certification) has been issued. Clerks did not have any information. <br /> Spoke to the Plans Examining Manager. He said they will get on it. <br /> September 18, 2012 Bulletin#2 is posted on the website. We are waiting for our permits to be issued. <br /> Question 1: Is the County going to be liable for a County Code Compliant Installation? <br /> Question 2: Is the revenue generated by the cost of the permits enough to pay for the Building Department? <br />
The URL can be used to link to this page
Your browser does not support the video tag.