My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0418.000 2012-2014
ClerkCouncil
>
Council Records
>
Communications
>
2012-2014
>
COM 0418.000 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2013 3:35:02 PM
Creation date
9/3/2013 11:23:15 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2012-2014
Communication
0418
Point
000
Author
Nancy Crawford, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 2013/10/02 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Council
AGE COUNCIL 2013/10/16 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Council
AGE FC 2013/09/17 2012-2014
(Related)
Path:
\Council Records\Agendas\2012-2014\Finance Committee (FC)
BIL 127 Draft 01 2012-2014
(Related)
Path:
\Council Records\Bills\2012-2014
REP FC 094 09/17/2013 (2012-2014)
(Related To)
Path:
\Council Records\Reports\2012-2014\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Form #: B-52 <br /> 7/18/91 <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Public Works DATE: 8/19/13 <br /> STAFF CONTACT: Casey K. Yanagihara PHONE: 961-8004 <br /> A. REQUEST: <br /> An ordinance amending Ordinance 13-66, the capital budget, by increasing the County <br /> appropriation in the amount of $308,000 for a new county total of $758,000.00. <br /> Ali`i Drive Culvert Replacement <br /> 110.388.5386.04 County portion: [$450,000.00] $758,000.00 <br /> B. BACKGROUND AND JUSTIFICATION USE ADDITIONAL SHEETS AS NEEDED : <br /> This project will replace the existing culvert, with a wider and longer bridge, over the <br /> Waiaha drainageway on Ali`i Drive. The existing concrete culvert has an insufficient <br /> design flow capacity and is structurally deficient and functionally obsolete. This is an <br /> increase in the appropriation to allow for consultant design services. The $758,000 <br /> appropriation increase is for the County's matching funding needed for the planning, <br /> design, and engineering of the project. <br /> SIGNED: DATE: IZZ/t3 <br /> Depart nt Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.