My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0410.000 2012-2014
ClerkCouncil
>
Council Records
>
Communications
>
2012-2014
>
COM 0410.000 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2013 8:57:52 AM
Creation date
9/9/2013 10:52:24 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2012-2014
Communication
0410
Point
000
Author
William P. Kenoi, Mayor
Communications - Referred To
PC
Document Relationships
NTC PC 2013/10/01 2012-2014 (Continuation of Sept. 17 mtg (see Agendas folder))
(Related)
Path:
\Council Records\Notices\2012-2014\Committees\Planning Committee (PC)
AGE COUNCIL 2013/10/16 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Council
AGE COUNCIL 2013/11/06 2012-2014
(Related To)
Path:
\Council Records\Agendas\2012-2014\Council
AGE PC 2013/09/17 2012-2014
(Related)
Path:
\Council Records\Agendas\2012-2014\Planning Committee (PC)
BIL 121 Draft 01 2012-2014
(Related)
Path:
\Council Records\Bills\2012-2014
REP PC 048 2013/10/01 (2012-2014)
(Related To)
Path:
\Council Records\Reports\2012-2014\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Planning Department Exhibit 1 —Amendment Request dated March 27,2013) <br /> 2. Reasons for Request: The applicant has submitted the following reasons for the time <br /> extension request: <br /> • Our civil engineer decided to conduct a foundation inspection which then changed <br /> our approach to design. Mechanical, Helco, and electrical took a very long time <br /> to complete—all unforeseen and frustrating. <br /> • Currently,plans and specs have been submitted to your department(Planning <br /> Department)by Architect Jerry Watanabe AIA, and I apologize however, it is not <br /> possible to complete our project by July 2013. <br /> 3. Landowner: The landowner of the properties is the applicant, Vince M. Kimura. <br /> BACKGROUND INFORMATION <br /> 4. July 9, 2003: Effective date of Change of Zone Ordinance No. 03-109 (REZ 1018) <br /> approved by the County Council, which reclassified lands from RS-10 to MCX-20). The <br /> applicant, HAKS, INC., proposed to construct two (2) warehouse buildings, one building <br /> for storage and the other building was to be used for a combination of retail/warehouse or <br /> other permitted industrial uses. (Planning Department Exhibit 2—Change of Zone <br /> Ordinance No. 03-109) <br /> 5. July 31,2007: The applicant received final plan approval for a 17,848 square foot <br /> warehouse and retail facility for Central Supply, Inc. on July 31, 2007 from the Planning <br /> Department. <br /> 6. June 26,2008: The Planning Director granted a five-year administrative extension of <br /> time to Condition C(time to complete construction)until July 9, 2013. <br /> 7. March 23,2011: Date of Final Subdivision Approval for SUB 04-000204 Revised, <br /> which consolidated two lots and re-subdivided them to create one large lot for the project <br /> site and to create the 10-future road widening lot,which will be dedicated to the County <br /> once the infrastructure improvements are completed. <br /> DESCRIPTION OF STATE AND COUNTY PLANS <br /> 8. General Plan LUPAG Map: Industrial. <br /> 9. State Land Use Designation: Urban. <br /> 10. County Zoning: Industrial-Commercial Mixed(MCX-20). <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.