My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0485.009 2012-2014
ClerkCouncil
>
Council Records
>
Communications
>
2012-2014
>
COM 0485.009 2012-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2014 10:50:23 AM
Creation date
1/28/2014 10:34:11 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2012-2014
Communication
0485
Point
009
Author
Brenda J. Ford, Council Member
Communications - Referred To
PC
Document Relationships
AGE PC 2014/02/18 2012-2014
(Related)
Path:
\Council Records\Agendas\2012-2014\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 23, 2014 <br /> Page 2 of 5 <br /> stubout on the north side of parcel TMK: 7-5-017:043 to <br /> Hualalai Road including the intersection on Hualalai Road and <br /> any street lighting or traffic signal lights as required by the <br /> Department of Public Works; and <br /> 01 The construction of a stub-out street on the south side of this <br /> parcel that will eventually connect to Pualena Street through <br /> the parcel identified as TMK:7-5-017:022; and <br /> 01 The construction and connection of any unnamed street(s) <br /> from the stub-out that intersects with Hualalai Road to the <br /> stub-out of Pualani Street to TMK: 7-5-017:022 and to the <br /> southern makai boundary of parcel identified as TMK: 7-5- <br /> 017:042. <br /> The performance bond shall cover the cost of all streets, stub-outs, <br /> intersections, curbs, gutters, sidewalks, street lights, and traffic signal lights <br /> interior to the subdivision and along the improved portions of Hualalai <br /> Road, including the intersection of this parcel to Hualalai Road as required <br /> by the Director of Public Works, until all streets, curbs, gutters, sidewalks, <br /> intersections, and street lighting are dedicated to the County. <br /> The performance bond amount shall start at 110% of the estimated cost <br /> of all interior roads and intersections, curbs, gutters, sidewalks, and street <br /> lights in the proposed development, including the improved portion of <br /> Hualalai Road and its intersection with the proposed development. The <br /> premiums for the bond, bond issuance costs, and escalation costs are the <br /> responsibility of the applicant and shall not run with the land. As long as the <br /> proposed development is not 100% completed and dedicated to the County, <br /> the bond and its escalation costs shall be paid for by the applicant. <br /> Escalation is an allowance to provide for the anticipated increase in costs <br /> during construction or during the time period between the approval of this <br /> ordinance and the completion of 100% of the construction and dedication of <br /> those roads to the County. An annual escalation cost shall be added to the <br /> bond amount based on the current road and infrastructure construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.