Laserfiche WebLink
G. Access to the subject project site shall be restricted to Lehua Lane, which <br />shall be improved with a minimum pavement width of 24 feet along its <br />entire length from its intersection with the Hawaii Belt Highway to and <br />including its intersection with Keaka Parkway. <br />H. The applicant shall construct all recommended improvements to the <br />Hawaii Belt Highway at its intersection with Lehua Lane as may be <br />required by the State Department of Transportation prior to the issuance of <br />a Certificate of Occupancy for any portion of the proposed development. <br />I. Any increase in road maintenance fees to accommodate uses generated by <br />the proposed development that is assessed by the HOVE Community <br />Association or the HOVE Road Maintenance Corporation shall be the <br />responsibility of the applicant, its successors or assigns. <br />J. All development - generated runoff shall be disposed of on -site and shall <br />not be directed toward any adjacent properties. A drainage study shall be <br />prepared by a licensed civil engineer and submitted to the Department of <br />Public Works prior to issuance of a construction permit. Any <br />recommended drainage improvements, if required, shall be constructed <br />meeting with the approval of the Department of Public Works prior to <br />receipt of a Certificate of Occupancy. <br />K. All earthwork activity shall conform to Chapter 10, Erosion and <br />Sedimentation Control, of the Hawaii County Code. <br />L. Wastewater disposal shall meet the specifications and requirements of the <br />Department of Health. <br />M. Should any remains of historic sites, such as rock walls, terraces, <br />platforms, marine shell concentrations or human burials be encountered, <br />work in the immediate area shall cease and the Department of Land and <br />Natural Resources - Historic Preservation Division (DLNR -HPD) shall be <br />immediately notified. Subsequent work shall proceed upon an <br />archaeological clearance from the DLNR -HPD when it finds that sufficient <br />N <br />