My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0045.000 2014-2016
ClerkCouncil
>
Council Records
>
Communications
>
2014-2016
>
COM 0045.000 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2015 3:27:27 PM
Creation date
12/23/2014 11:46:11 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2014-2016
Communication
0045
Point
000
Author
Nancy Crawford, Director of Finance
Communications - Referred To
FC
Document Relationships
BIL 010 Draft 01 2014-2016
(Related To)
Path:
\Council Records\Bills\2014-2016
REP FC 002 2015/01/06 (2014-2016)
(Related To)
Path:
\Council Records\Reports\2014-2016\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA UNAKEA OBSER VA TORIES <br />SUPPOR T SER VICES <br />Ron Thiel <br />County of Hawaii, Department of Public Works <br />Traffic Division Chief <br />177 Makaala St. Hilo. Hawaii, 94720 <br />Phone (808) 974 -4205 Fax (808) 974 -4215 <br />Re: Summit Access Roadwork Adjacent to the Maunakea Visitor Information Station <br />November 12, 2014 <br />The purpose of this memorandum is to affirm that once a CIP is approved, MKSS will transfer $55,000 to the County <br />of Hawaii for roadwork adjacent to the Maunakea Visitor Information Station. These funds, and MKSS assistance, <br />would be used by Hawaii County for roadwork adjacent to the Maunakea Visitor Information Station. See below: <br />The money transfer is contingent upon the passage of a CIP resolution within Hawaii County to ensure any money <br />received from MKSS could only be used to fund this project. The project includes: <br />- Resurface approximately 800 feet of road adjacent to the Visitor's Information Station. <br />- Pave a parallel parking shoulder, approximately 200' long by 12' wide, on the east side of the road. <br />- Pave and widen from 17' to 24', a diagonal parking shoulder, 500 feet long by 24' on the west side of the road. <br />This would involve pushing back the cinder in the right -of -way by about 7', expanding the width from 17' to 24'. <br />- Replace the 4 temporary speed humps with permanent asphalt sinusoidal speed humps. <br />- Re- stripe the area with lane markings and traffic calming markings. <br />Sincere y <br />OJ4161 speed bumps, widen and pave off-roAO, parkinf%,sp 4s tc, a cl--001 of 24% <br />is,purrently 32 feet wide including the paved shr,..ulder. T ho right of way is 100' <br />—A eh,,.. A– irlq,� marl im thc3 center. This proiect would widen the paved area to <br />Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.