Laserfiche WebLink
FUEL TAX INCREASE PROGRAM - BALANCES LAPSED AS OF 6/30/14 <br />Category 96-98 98-00 00-02 <br />04-06 06-08 08-10 <br />Total <br />Engineering Division Projects: <br />North Kona Engineering 13,762.13 85.02 <br />13,847.15 <br />Roadway Projects 129,706.78 <br />1,094,410.97 1,655,458.40 <br />2,879,576.15 <br />Bridge Inspect, Repair, &Replace Program <br />10,588.21 <br />10,588.21 <br />ADA Curb Cut &Accessible Route Program <br />3,762.00 366,882.65 <br />370,644.65 <br />Local Road Improvement: <br />North Hilo <br />109,019.82 <br />109,019.82 <br />North Kona <br />2,112.65 <br />2,112.65 <br />TOTAL 13,762.13 85.02 129,706.78 <br />3,762.00 1,094,410.97 2,144,061.73 <br />3,385,788.63 <br />EXHIBIT "B" <br />