My WebLink
|
Help
|
About
|
Sign Out
Home
RES 072 Draft 01 2014-2016
ClerkCouncil
>
Council Records
>
Resolutions
>
2014-2016
>
RES 072 Draft 01 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 4:18:27 PM
Creation date
2/2/2015 9:43:58 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2014-2016
Bill/Resolution
072
Draft
01
Introducer
Dru Mamo Kanuha, Council Chair
Referred To
EMC
Action 1
EMC: Adopts Res. 72-15 - 02/17/15
Action 2
Council: Adopts Res. 72-15 & EMC-1 - 03/04/15
Status
Adopted
Date To Mayor or Adoption Date
3/4/2015
Reading Number
1
Reading Date
3/4/2015
Ayes
9-Chung;David;Eoff;Ilagan;Kanuha;Onishi;Paleka;Poindexter;Wille
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 03/04/2015 2014-2016
(Related)
Path:
\Council Records\Agendas\2014-2016\Council
AGE EMC 2015/02/17 2014-2016
(Related)
Path:
\Council Records\Agendas\2014-2016\Environmental Management Committee (EMC)
COM 0110.000 2014-2016
(Related To)
Path:
\Council Records\Communications\2014-2016
REP EMC 001 2015/02/17 (2014-2016)
(Related To)
Path:
\Council Records\Reports\2014-2016\Environmental Management Committee (EMC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Description of the Assessment Unit and Method of Assessment. <br />a. Assessment Unit. For purposes of the Improvement District, "Assessment unit" <br />shall mean a duly subdivided parcel of land or condominium unit bearing a <br />unique tax map key number. <br />b. Method of Assessment. <br />i. As used in this Resolution, "Net Project Costs" means the Project Costs, <br />less any amounts which reduce the actual costs of the special improvements <br />to the County. By way of example, assuming the Project Costs to be <br />$6,461,800 as set forth in the Director's Report, and further assuming an <br />RUS grant of $4,024,800 to be applied against the Project Costs, the Net <br />Project Costs would be $2,437,000. The Net Project Costs are equivalent <br />to the RUS loan amount. <br />ii. Each assessment unit existing as of the date that assessments begin to <br />accrue on assessment units within the Improvement District (the <br />"Commencement Date") shall be subject to an assessment calculated by <br />(A) dividing the Net Project Costs by the total number of single-family <br />equivalent (SFE) represented by all assessment units in the Improvement <br />District, and (B) with respect to each assessment unit, multiplying the <br />amount determined pursuant to (A) above by the number of SFEs <br />represented by such assessment unit. For purposes of the foregoing, SFEs <br />shall be determined in the manner provided in the Director's Report based <br />on each assessment unit's existing land use as of the Commencement Date; <br />provided that if an assessment unit is vacant, the SFE for that assessment <br />unit shall be based on existing zoning. <br />7. Materials to be Used. The materials to be used in the construction and installation of <br />the Sewer System are set forth in the Director's Report, which is incorporated herein <br />by reference, and include, without limitation, the following: <br />a. 5,640 Lin. Ft., 8 -inch PVC SDR -26 sewer pipe and fittings <br />b. 360 Lin. Ft., 10 -inch PVC SDR -26 sewer pipe and fittings <br />c. 29 Each, sewer manholes 5.0' to 9.5' deep <br />d. 4 Each, lined shallow drop sewer manholes 10.0' to 14.99' deep <br />e. 1 Each, lined drop sewer manholes 15.00' to 20.00' deep <br />f. 110 Each, sewer lateral connection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.