Laserfiche WebLink
concrete curb, gutter and sidewalk,drainage improvements,and any relocation of utilities <br /> meeting with the approval of the Department of Public Works. Pavement transitions, <br /> streetlights, signs and markings, drainage improvements, and relocation of utilities may be <br /> required. The applicant shall construct and dedicate to the County upon request, the <br /> widened street with improvements, at no cost to the County. An approach for the <br /> commercial zoned property fronting the opposite side of Hualalai Road (TMK: 7-5-10:13) is <br /> required under Ordinance 95 118, to include turning lanes on Hualalai Road. The widened <br /> area to be dedicated to the County shall, if required by DPW, allow for realignment and <br /> improvements required by Ordinance 95 118 or successor ordinances. The required <br /> widening area shall not exceed the equivalent of a five foot width along the entire frontage, <br /> which is approximately one-half the difference between the existing right-of way width and <br /> 60 feet. <br /> • <br /> E. As represented by the applicant, a non-gated access to Hualalai Road shall be limited to one <br /> approach and may include an additional access which shall be barricaded and used for <br /> emergency purposes only. The approaches shall conform to Chapter 22, Streets and <br /> Sidewalks,of the Hawai`i County Code. A licensed civil engineer shall evaluate the <br /> proposed active approach to the subject property for safe ingress and egress, sight distance <br /> and conflicts with the proposed turn lane and entry in TMK: 7-5-10:13. The evaluation shall <br /> be submitted for approval by the DPW prior to plan approval. If recommended,the <br /> applicant shall provide a left storage Iane on Hualalai Road to the subject property prior to <br /> the issuance of a certificate of occupancy. All sight distances to the approach shall meet <br /> with the requirements of the Hawai`i Statewide Uniform Design Manual or AASHTO. <br /> F. Any emergency vehicular security gate shall be located in a location approved by the <br /> Department of Public Works. <br /> G. All development-generated runoff shall be disposed of on site and shall not be directed <br /> toward any adjacent properties. A drainage study shall be prepared and submitted to the <br /> Department of Public Works prior to issuance of any construction permit. Recommended <br /> drainage improvements shall be constructed meeting with the approval of the Department of <br /> Public Works prior to the issuance of a certificate of occupancy. <br /> -4- <br /> . i 1 <br />