Laserfiche WebLink
Final Subdivision or Final Plan Approval, whichever is applicable, shall be <br />secured from the Planning Director for any of the above uses prior to the <br />issuance of any land alteration permits for any development phase in the <br />Kaupulehu Project District. <br />J. Construction of the resort residential units, commercial development, golf <br />course and other related improvements shall commence only after Final <br />Subdivision Approval and Final Plan Approval has been secured. <br />K. The applicant shall provide assurance satisfactory to the Department of Water <br />Supply and the Planning Director, upon consultation with the State Department <br />of Health and Department of Land and Natural Resources, that water sources of <br />sufficient quality and quantity has been established. Such satisfactory assurance <br />can be met by the actual drilling and testing of a well site of the water source or <br />by the submittal of a hydrological study certifying that a water sources of <br />sufficient quality and quantity can be established at the designated locations. <br />L. Upon compliance with Condition K, the actual development of the water source <br />and its water transmission and distribution system shall be developed in <br />conjunction with the subdivision approval process. Final inspection to the <br />residential structures shall not be issued until the approved water source is <br />developed and its transmission and distribution system for such source to the <br />subject property has been constructed. Residential building permits may be <br />issued for model home complexes, provided that such model homes will not be <br />occupied until the approved water source is developed. <br />M. The interior roadway requirements for the Kaupulehu Project District shall be <br />designed to resort standards as allowed by the Subdivision Code and as <br />represented in Section 3.3.1 of the applicant's Project District Application. <br />16- <br />