My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0872.000 2014-2016
ClerkCouncil
>
Council Records
>
Communications
>
2014-2016
>
COM 0872.000 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2016 2:38:14 PM
Creation date
4/19/2016 9:07:40 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2014-2016
Communication
0854
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
COUNCIL
Document Relationships
BIL 202 Draft 01 2014-2016
(Related To)
Path:
\Council Records\Bills\2014-2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B-52 <br /> 7/18/91 <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Dept of Environmental Management DATE: 04/11/16 <br /> STAFF <br /> CONTACT: Dora Beck PHONE: 961-8513 <br /> A. REQUEST: <br /> An Ordinance authorizing the Mayor to enter into an intergovernmental agreement for a State Water <br /> Pollution Control Revolving Fund Loan for Wastewater improvement projects and authorizing the issuance <br /> of$14,000,000 General Obligation Bonds of the County of Hawai'i for the purpose of financing the following <br /> project: <br /> Pua Force Main Installation and Rehabilitation $14,000,000 <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> All raw wastewater from Hilo town (average of 2.8 MGD or Million Gallons per Day) is conveyed to the Hilo <br /> Wastewater Treatment Plant (HWWTP) via the Pua SPS and the existing force main. Recent tests performed <br /> by the Wastewater Division on the existing force main shows signs of restriction which negatively affects the <br /> performance of the equipment that makes up the pumping system that conveys wastewater to the HWWTP. <br /> The installation of a new additional sewage force main from the Pua Sewage Pump Station (Pua SPS) to the <br /> HWWTP and the rehabilitation of the existing 24-inch sewer force main are required to address and correct <br /> deficiencies in the existing force main. Once installation of the new force main is complete, the existing Force <br /> Main will be rehabilitated to remove the cause of the existing flow restriction in the system as well as to <br /> incorporate mitigation measures to address critical performance factors. Rehabilitation of the existing force <br /> main (once the new force main is installed and placed into operation) is desirable as it provides a redundant <br /> means of conveying raw wastewater from Hilo town to the HWWTP for treatment in the event of required <br /> maintenance work on one of the two force mains. An all-night live repair of the existing force main was <br /> required in 2011 to keep the force main in service while repairing a crack in the force main pipe. <br /> Failure of the existing force main would result in a raw sewage spill to State Waters via the Hilo Outfall and <br /> would subject the County to potential enforcement action by regulatory agencies. It is noted that the existing <br /> sewer force main was installed in 1990 and is therefore 26 years old. The age and the deficiencies in the force <br /> main are major contributors to decreasing the serviceability of equipment needed to convey raw sewage to the <br /> HWWTP. <br /> SIGNED: O71tLi,c DATE: 4-///1 /16" <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.