Laserfiche WebLink
(E) subdivision plans for the second increment shall be submitted within one year from <br /> the effective date of the zoning for that increment. Final subdivision plans for the second <br /> increment shall be submitted within one year from the effective date of tentative <br /> subdivision approval; <br /> (F) access(es) for the proposed subdivision shall meet with the approval of the Chief <br /> Engineer; <br /> (G) a drainage improvement plan, meeting with the approval of the Chief Engineer, shall <br /> be developed; <br /> [(H)restrictive deed covenants for each lot shall be recorded with the Bureau of <br /> hall include a mandatory agricultural use provision for each lot as previously defined in <br /> Condition C. The covenants shall require all dwellings to meet the definition of farm <br /> to a maximum of one half acre per lot. "Farm dwelling" as used herein means a single <br /> family dwelling located on and in connection with a farm or where agricultural activity <br /> -hall ran with the land and shall be incorporated into any deed, lease, agreement of sale, <br /> mortgage, or other instrument of conveyance executed for the subject property(ies);] and <br /> [(-I)] (H)all other applicable rules,regulations and requirements shall be complied with. <br /> Should any of the forgoing conditions not be met, rezoning of the area to its original or <br /> more appropriate designation may be initiated." <br /> SECTION 2. Material to be repealed is bracketed and stricken. Material to be added is <br /> underscored. In re-printing this ordinance, the brackets, bracketed and stricken material, and <br /> underscoring need not be included. <br /> 3 <br />