My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 217 Draft 02 2014-2016
ClerkCouncil
>
Council Records
>
Bills
>
2014-2016
>
BIL 217 Draft 02 2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 10:41:04 AM
Creation date
7/25/2016 8:26:42 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2014-2016
Bill/Resolution
217
Draft
02
Introducer
Greggor Ilagan, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 217, Draft 2 passes first reading; adopts PC-71 - 07/19/16
Action 2
Council: Bill 217, Draft 2 passes second & final reading - 08/03/16
Status
Adopted
Date To Mayor or Adoption Date
8/11/2016
Reading Number
1
Reading Date
7/19/2016
Ayes
9-Chung;David;Eoff;Ilagan;Kanuha;Onishi;Paleka;Poindexter;Wille
Noes
0
Absent
0
Excused
0
Reading Number .
2
Reading Date .
8/3/2016
Ayes .
9-Chung;David;Eoff;Ilagan;Kanuha;Onishi;Paleka;Poindexter;Wille
Noes .
0
Absent .
0
Excused .
0
Document Relationships
AGE COUNCIL 08/03/2016 2014-2016
(Related)
Path:
\Council Records\Agendas\2014-2016\Council
COM 0908.004 2014-2016
(Related)
Path:
\Council Records\Communications\2014-2016
ORD 2016-087 2014-2016
(Message)
Path:
\Council Records\Ordinances\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional water meters on private property, which must be inspected and <br /> approved by the Department of Water Supply. <br /> D. Should the applicant, successors or assigns develop a land use which the Planning <br /> Department, in consultation with the Department of Public Works, determines <br /> will generate over 50 peak hour trips, a Traffic Impact Analysis Report (TIAR) <br /> shall be submitted for review and approval by the Department of Public Works <br /> prior to Final Plan Approval. The applicants shall implement, when required by <br /> the Department of Public Works, at no cost to the County, any transportation <br /> system improvements to Manono Street that may be deemed necessary by the <br /> Department of Public Works. <br /> E. Construction of the proposed commercial development shall be completed within <br /> five (5) years from the effective date of this ordinance. Prior to construction, the <br /> applicant(s), successor(s) or assign(s) shall secure Final Plan Approval for the <br /> proposed development from the Planning Director in accordance with Section <br /> 25-2-70, Chapter 25 (Zoning Code), Hawai`i County Code. Plans shall identify <br /> all existing and/or proposed structure(s), paved driveway access and parking stalls <br /> associated with the proposed development. Landscaping shall be indicated on the <br /> plans for the purpose of mitigating any adverse noise or visual impacts to adjacent <br /> properties in accordance with the requirements of Planning Department's Rule <br /> No. 17 (Landscaping Requirements) standards for CN zones adjoining a RS zone. <br /> F. Driveway access from Manono Street shall conform to Chapter 22, Streets and <br /> Sidewalks, of the Hawai`i County Code. <br /> G. All development-generated runoff shall be disposed of on site and shall not be <br /> directed toward any adjacent properties. If required, a drainage study shall be <br /> prepared by a licensed civil engineer and submitted to the Department of Public <br /> Works prior to issuance of a construction permit. Any recommended drainage <br /> improvements, if required, shall be constructed meeting with the approval of the <br /> Department of Public Works prior to receipt of a Certificate of Occupancy. <br /> H. The project shall connect to the County sewer line fronting the property. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.