Laserfiche WebLink
[]L. A drainage study shall be prepared for review and the recommended drainage <br />system shall be constructed meeting with the approval of the Department of <br />Public Works. The drainage improvements shall be constructed or bonded prior . <br />to receipt of final subdivision approval. <br />[K:]M. The proposed subdivision shall connect to the County sewer system. <br />[L.]N. Comply with Chapter 11-55, Water Pollution Control, [Hawaii] Hawai`i <br />Administrative Rules, Department of Health, which requires an NPDES permit <br />for certain construction activity. <br />[M -.]O. During construction, measures shall be taken to minimize the potential of both <br />fugitive dust and runoff sedimentation. Such measures shall be in compliance <br />with construction industry standards and practices utilized during construction <br />projects of the State of [iii] Hawaii. <br />[N:]P. All earthwork and grading shall conform to Chapter 10, Erosion and Sediment <br />Control of the [vwaii] Hawaii County Code. <br />[&.]Q. The U.S. Department of Army Corps of Engineers shall be contacted to identify. <br />whether a Federal Permit (including a Department of Army permit) is required for <br />this project. The Planning Director shall be notified in writing as to whether such <br />permit is required for the development of the project. <br />[g]R 1 b > ea ; <br />entefy survey shat be sub i#e to the State of Hawaii <br />L J L [ A 1, <br />Ma <br />