My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 022 Draft 03 2016-2018
ClerkCouncil
>
Council Records
>
Bills
>
2016-2018
>
BIL 022 Draft 03 2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 2:59:48 PM
Creation date
5/8/2017 8:40:48 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2016-2018
Bill/Resolution
022
Draft
03
Introducer
Karen Eoff, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 22, Draft 3 passes second & final reading - 05/03/17
Status
Adopted
Date To Mayor or Adoption Date
5/11/2017
Reading Number
2
Reading Date
5/3/2017
Ayes
9-Chung;David;Eoff;Kanuha;Lee Loy;O'Hara;Poindexter;Richards;Ruggles
Noes
0
Absent
0
Excused
0
Document Relationships
COM 0181.005 2016-2018
(Related To)
Path:
\Council Records\Communications\2016-2018
ORD 2017-032 2016-2018
(Related To)
Path:
\Council Records\Ordinances\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The applicant shall install a reduced pressure type backflow prevention assembly <br /> within five (5) feet of the existing water meter and any additional water meters on <br /> private property, which must be inspected and approved by the Department of <br /> Water Supply. <br /> F. Prior to occupancy, the applicant shall provide pavement widening along the <br /> project frontage to a total of 18 feet from the existing centerline meeting with the <br /> approval of the Department of Public Works. Existing drainage and utilities may <br /> be maintained. <br /> G. Should the applicant, successors or assigns develop a land use, which the Planning <br /> Department, in consultation with the Department of Public Works, determines <br /> will generate over 50 peak hour trips, a Traffic Impact Analysis Report (TIAR) <br /> shall be submitted for review and approval by the Department of Public Works <br /> prior to Final Plan Approval. The applicant shall implement any transportation <br /> system improvements that may be deemed necessary by the Department of Public <br /> Works. <br /> H. All development-generated runoff shall be disposed of on site and shall not be <br /> directed toward any adjacent properties. A drainage study shall be prepared by a <br /> licensed civil engineer and submitted to the Department of Public Works prior to <br /> Final Plan Approval. Any drainage improvements, if required, shall be <br /> constructed meeting with the approval of the Department of Public Works prior to <br /> the issuance of a Certificate of Occupancy. <br /> The method of sewage disposal shall meet with the requirements of the State <br /> Department of Health. <br /> J. The applicant shall be responsible for the maintenance of the chain-link fence that <br /> serves to delineate a 15-foot buffer for the archaeological preserve as it occurs on <br /> the south-west corner of the subject property as required by Use Permit No. 72. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.