My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2018-096 2016-2018
ClerkCouncil
>
Council Records
>
Ordinances
>
2018
>
ORD 2018-096 2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 8:34:28 AM
Creation date
10/5/2018 8:32:15 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2016-2018
Year
2018
Ordinance
096
Effective Date
10/1/2018
Document Relationships
BIL 178 Draft 01 2016-2018
(Related)
Path:
\Council Records\Bills\2016-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Access to the subject parcel shall be limited through the Road and Utility Easement <br /> ("RU-3") and shall conform to Chapter 22, County Streets, of the Hawai`i County Code. <br /> H. Install street lights and traffic control devices as may be required by the Traffic Division, <br /> Department of Public Works. <br /> The applicant shall install a wastewater disposal system meeting with the requirements of <br /> the Department of Health. <br /> J. The applicant shall allow unrestricted access through the 15-foot wide road and utility <br /> easement ("RU-3") within the property to the owner of TMK 2-3-37: 16. The applicant <br /> shall also allow unrestricted access through the 25-foot wide road and utility easement <br /> ("RU-7") within its other property identified as TMK 2-3-37: 10 to the owners of <br /> TMK: 2-3-37: 8 and 9, as well as any other property that is supposed to have any <br /> easement over any of the applicant's properties within lots created by and required by <br /> Subdivision No. 7389. <br /> K. All development-generated runoff shall be disposed of on-site and shall not be directed <br /> toward any adjacent properties. A drainage study shall be prepared and the recommended <br /> drainage system shall be constructed, meeting the approval of the Department of Public <br /> Works, prior to receipt of a Certificate of Occupancy. <br /> L. [A Solid Waste Management Plan shall be submitted to the Department of Environmental <br /> Management for review and approval prior to the issuance of a Certificate of Occupancy.] <br /> [All outdoor lighting shall be fully shielded so the bulb can only be seen from below bulb <br /> height and only use when necessary in order to avoid seabird disorientation, fallout, injury <br /> or mortality. The applicant shall avoid nighttime construction during the s-abird fledging <br /> period (September 15 through December 15).] During construction, measures shall be <br /> taken to minimize the potential of both fugitive dust and runoff sedimentation. Such <br /> measures shall be in compliance with construction industry standards and practices <br /> utilized during construction projects in the State of Hawai`i. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.