My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0010.002 2018-2020
ClerkCouncil
>
Council Records
>
Communications
>
2018-2020
>
COM 0010.002 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:06:22 PM
Creation date
12/11/2018 2:34:51 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2018-2020
Communication
0010
Point
002
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Comments
FC: Close file - 1/8/19.
Document Relationships
AGE FC 2019/01/08 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF CHANGE ORDERS AUTHORIZED <br /> FOR THE PERIOD OF:11/01/18-11/15/18 <br /> legend: <br /> CO Change Order <br /> SA Supplemental Agteemenl <br /> ps Ptolessional Ignites <br /> C Construction <br /> P01 Pad;Term Agreement <br /> OS 01Rer 6o00s&Services <br /> Original Original % Cum0latve %ol <br /> Execution SOD Mann Pooled Canna Dent 000trad Contract CO/SA CO/SA Bolt CO/SA Out Contractor pr0Oet Med PBorose <br /> Dale 0 0 TIiie Type 8018811 Dale No. 1110081 Com Total Coot Manager Slants <br /> 11/1/20181FB43670 N/A Price Term Agreement for furnishing Vehicle Detailing Services PTA FIN $0.00 1/10/2018 1 $0.00 0 - $0.00 0 Hawaii Lobe CO.,LIC. Steve Wilhelm Open option year of 4 <br /> Denie Lyn modification to scope to address additional repair and maintenance needs and time extension to <br /> 11/5/2010 N/A C.004073 Pana'ewa Rainforest Zoo and Equestrian Center Accessibility Improvements Program PS PR $339,436.78 10/15/2013 1 $97,009.80 29% $97,009.80 29%Fleming&Associates,LLC Quitoriano Open address new scope. <br /> 11/8/2018 E-4419 0.006794 Hakalau Stream Bridge(429-3)North Abutment Foundation Emergency Scour Repair C DPW $1,644,000.00 1/10/2008 1 -$244,996.47 -15% -$244,936.47 -15%Hawaiian Dredging Construction Company,Inc Cres Rambayon Open Closing Change Order to reflect actual quantities installed in field <br /> Manuiwa Airways,Inc dba Volcano <br /> 11/9/2018 IFR03486 N/A Chopper 1 Flight Operations and Repair Services PTA FIN $0.00 12/19/2016 2 $0.00 0 $0.00 0 Helicopters Sebastian Calaway Open option year 2 of 4 <br /> 4 Total Original Contract $1,963,436.78 Total CO/SA 4 <br /> Contracts A1900111 let Per104 <br /> TOtal f0/SA -$147,926.67 <br /> Amo0nt tar PettOa <br /> I <br /> i' <br />
The URL can be used to link to this page
Your browser does not support the video tag.