My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0084.000 2018-2020
ClerkCouncil
>
Council Records
>
Communications
>
2018-2020
>
COM 0084.000 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 1:46:53 PM
Creation date
1/24/2019 9:23:35 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2018-2020
Communication
0084
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
COUNCIL
Document Relationships
AGE COUNCIL 2019-02-05 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Council
AGE COUNCIL 2019-02-20 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Council
BIL 020 Draft 01 2018-2020
(Related To)
Path:
\Council Records\Bills\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form #: B-52 <br /> 7/18/91 <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Environmental Management DATE: 01/10/2019 <br /> STAFF CONTACT: Dora Beck PHONE: 961-8513 <br /> A. REQUEST: <br /> An Ordinance authorizing the Mayor to enter into an intergovernmental agreement for a State Pollution <br /> Control Revolving Fund Loan for a Wastewater improvement project and authorizing the issuance of ,\ <br /> $1,500,000 General Obligation Bonds of the County of Hawai'i for the purpose of financing the following <br /> project: <br /> Lanihau Wastewater Pump Station Force Main Replacement $1,500,000 <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> The Lanihau Wastewater Pump Station handles sewage in the vicinity of Alli Drive-Palani-Kaahumanu Place <br /> intersection. Attachment A illustrates the sewer connections that the Lanihau Wastewater Pump Station <br /> services. Estimated future flow for the pump station is 1.9 million gallons per day. The Lanihau Wastewater <br /> Pump Station cast iron Force Main is 55-years old and is at the end of its useful life. <br /> On June 12, 2017, the Hawaii County Department of Environmental Management (DEM) reported that a <br /> sewage spill had occurred at Alii Drive and Palani Road in Kailua-Kona due to ruptured force main. The <br /> release was discharged into Kailua Bay after flowing into nearby storm drains that empty into the bay. <br /> The recent emergency repairs to sections of the failing 6-inch cast iron pipe revealed that the integrity of the <br /> entire section is severely compromised requiring replacement of a 677-foot section to avoid additional pipe <br /> failures that would result in the release of raw sewage to Kailua Bay. <br /> This request will provide funding for this project and allow us to take advantage of the lower interest rates <br /> provided by the State Revolving Fund Loan Program. <br /> We respectfully request that this bill be waived from the Council's Finance Committee in order to expedite this <br /> project. <br /> SIGNED: ! DATE: l�//11 <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.